DOE N 251.117 |
directives |
Cancellation of Directives
|
Cancels DOE P 226.1B |
pworthington |
Cancellation Notice |
AU - Office of Environment, Health, Safety and Security
|
Aug 09, 2016
|
Archive |
|
directives |
New - DOE N 251.117, Cancellation of Directives
|
Effective immediately the following Department of Energy directive is canceled:
DOE P 226.1B, Department of Energy Oversight Policy, dated 4-25-2011 (Author: Pat Worthington; pat.worthington@hq.doe.gov; 301-903-5926)
|
mudijo |
|
|
|
DOE O 5000.3 |
directives |
Unusual Occurrence Reporting System
|
To set forth policy, assign responsibility, and provide criteria and instructions for reporting unusual occurrences that have programmatic significance at Department of Energy (DOE) operations, analyzing information reported, and disseminating the analysis results. |
Administrator |
Order |
EH - Office of Environment, Safety and Health
|
Nov 07, 1984
|
Archive |
DOE O 151.1D |
directives |
Comprehensive Emergency Management System
|
The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Supersedes DOE O 151.1C. Cancels DOE M 151.1-1. Superseded by DOE O 151.1D Chg1 (MinChg). |
JBerrios |
Order |
NA - National Nuclear Security Administration
|
Aug 11, 2016
|
Archive |
|
directives |
New - DOE O 151.1D, Comprehensive Emergency Management System
|
The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System.
|
pgz |
|
|
|
|
directives |
NEW - DOE O 551.1D Chg 2 (Minor Revision), Official Foreign Travel
|
The order establishes DOE requirements and responsibilities governing official foreign travel by Federal and contractor employees. The proposed revisions to the Official Foreign Travel Order align it with established leave policy and update organizational responsibilities.
|
pgz |
|
|
|
|
directives |
Notice of Intent to Develop DOE P XXX.X, Contractor Assurance Systems Policy
|
The Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) found that the implementation of contractor assurance system (CAS) is inconsistent and recommended that DOE ensure greater uniformity across the complex. CRENEL also recommended that site offices more extensively use data from CAS. |
pgz |
|
|
|
|
directives |
Notice of Intent to Revise DOE Order 442.1A, Department of Energy Employee Concerns Program
|
Revisions to DOE O 442.1A will help to bring about greater consistency throughout the DOE complex in the approach to processing employee concerns, and to support safety conscious work environment efforts. |
pgz |
|
|
|
|
directives |
Draft - DOE O 460.1D, Hazardous Materials Packaging And Transportation Safety
|
The Order establishes safety requirements for the proper packaging and transportation of offsite shipments and onsite transfers of radioactive and other hazardous materials, and for modal transportation.
|
pgz |
|
|
|
DOE O 413.3B Chg 2 (PgChg) |
directives |
Program and Project Management for the Acquisition of Capital Assets
|
The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Supersedes DOE O 413.3B Chg 1 (AdminChg) |
jglascock |
Order |
PM - Office of Project Management Oversight and Assessments
|
Nov 29, 2010
|
Archive |
DOE O 413.3B Chg 1 (Admin Chg) |
directives |
Program and Project Management for the Acquisition of Capital Assets
|
The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. |
jglascock |
Order |
PM - Office of Project Management Oversight and Assessments
|
Nov 29, 2010
|
Archive |
015.00C |
directives |
Delegation to the General Counsel
|
|
mudijo |
Delegation |
|
May 14, 2016
|
Rescinded |
DOE N 251.115 |
directives |
Cancellation of Directives
|
Cancels DOE O 350.2B, Use of Management and Operating (M&O) or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area, dated 5-31-11. |
ageary |
Cancellation Notice |
MA - Office of Management
|
May 10, 2016
|
Archive |
|
directives |
New - DOE N 251.115, Cancellation of Directives
|
Cancels DOE O 350.2B, Use of Management and Operating (M&O) or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area, dated 5-31-11.
|
pgz |
|
|
|
DOE O 456.1A |
directives |
The Safe Handling of Unbound Engineered Nanoparticles
|
The Order establishes requirements and assigns responsibilities for activities involving unbound engineered nanoparticles (UNP) to ensure that work involving UNP occurs in a safe and secure manner that protects workers, the public, and the environment. |
rkeeler |
Order |
AU - Office of Environment, Health, Safety and Security
|
Feb 01, 2016
|
Archive |
|
directives |
New -DOE O 413.3B Chg 3 (PgChg), Program and Project Management for the Acquisition of Capital Assets
|
The Order provides DOE and NNSA with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change and supports implementation of OMB Circulars A-11, A-123 and A-131. Supersedes DOE O 413.3B Chg 2 (PgChg) |
pgz |
|
|
|
DOE O 326.1A |
directives |
Confidential Financial Disclosure Reports (OGE 450)
|
The directive establishes requirements and responsibilities for Departmental elements and employees regarding filing Confidential Financial Disclosure Reports (OGE Form 450) in accordance with the Ethics in Government Act of 1978, as amended. Supersedes DOE O 326.1. |
Yvonne Stewart and William Grant |
Order |
GC - Office of General Counsel
|
Dec 27, 2016
|
Archive |
|
directives |
New - DOE O 326.1A, Confidential Financial Disclosure Reports (OGE 450)
|
The directive establishes requirements and responsibilities for Departmental elements and employees regarding filing Confidential Financial Disclosure Reports (OGE Form 450) in accordance with the Ethics in Government Act of 1978, as amended. Supersedes DOE O 326.1.
|
pgz |
|
|
|
DOE 4220.5 |
directives |
Dependent Care Programs for the Department of Energy Management and Operating Contractors
|
The order sets forth the policy, responsibilities, minimum requirements, and guidelines to be followed by DOE management and operating contractors when establishing dependent care programs. Does not cancel or supersede other directives |
rmyers |
Order |
PR - Office of Procurement Assistance and Program Management
|
Dec 19, 1991
|
Archive |
|
directives |
Quarterly Update July through September
|
|
mudijo |
|
|
|
|
directives |
Quarterly Update for October, November, and December 2013
|
|
mudijo |
|
|
|
|
directives |
Directives Quarterly Updates
|
Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.
|
mudijo |
|
|
|
|
directives |
Quarterly Update for April, May, and June
|
|
mudijo |
|
|
|
|
directives |
Quarterly Update for January, February, and March 2014
|
|
mudijo |
|
|
|
|
directives |
FY 2014, Q4 - July through September 2014
|
|
mudijo |
|
|
|
|
directives |
Quarterly Update April through June 2015
|
|
mudijo |
|
|
|
|
directives |
Quarterly Update for Oct, Nov, Dec 2014
|
|
mudijo |
|
|
|
|
directives |
FY, 15, Q1 - July through September 2015
|
|
mudijo |
|
|
|
|
directives |
RevCom
|
RevCom is the online review, comment, and approval system for draft DOE Directives. |
admin |
|
|
|
|
directives |
Contact Form
|
|
mudijo |
|
|
|
|
directives |
Department of Energy Procedures for Intelligence Activities
|
|
mudijo |
|
|
|
|
directives |
Implementation of PPD-28
|
|
mudijo |
|
|
|
|
directives |
Delegation of Authority for Signature
|
|
mudijo |
|
|
|
|
directives |
Email Notification
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 226.1B
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 231.1B
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 350.2C
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 415.1
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 440.1B
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 460.1C
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 460.2A
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE P 141.1
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 144.1
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 200.1A
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 225.1B
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 350.1
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 361.1B
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 413.3B
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 436.1
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 442.1B
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 442.2
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 450.2
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 451.1B
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 450.4A
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 541.1B
|
|
mudijo |
|
|
|
|
directives |
BPA equivalency for DOE O 580.1A
|
|
mudijo |
|
|
|
|
directives |
Review of Bonneville Power Administration's Human Capital Policies
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 520.1A
|
|
pgz |
|
|
|
|
directives |
BPA Exemption for DOE O 135.1A
|
|
pgz |
|
|
|
|
directives |
BPA Exemption for DOE O 143.1
|
|
pgz |
|
|
|
|
directives |
BPA Exemption for DOE O 522.1
|
|
pgz |
|
|
|
|
directives |
BPA Exemption for DOE O 523.1
|
|
pgz |
|
|
|
|
directives |
Clarification of the Department's Oversight and Review Process for Energy Savings and Performance Contracts
|
This memorandum clarifies that ESPCs are not required to follow the project management requirements outlined in DOE O 413.3B. |
mudijo |
|
|
|
DOE O 474.2 Chg 4 (PgChg) |
directives |
Nuclear Material Control and Accountability
|
The Order establishes performance objectives, metrics, and requirements for developing, implementing, and maintaining a nuclear material control and accountability (MC&A) program within the U.S. Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), and for DOE owned materials at other facilities that are exempt from licensing by the Nuclear Regulatory Commission (NRC). Chg 4 (PgChg) supersedes AdminChg 3, dated 5-15-15. Canceled by DOE O 474.2A, dated 2-7-23. |
dholmer |
Order |
EH - Office of Environment, Health, Safety and Security
|
Jun 27, 2011
|
Archive |
|
directives |
New - DOE O 474.2 Chg 4 (PgChg), Nuclear Material Control and Accountability
|
The Order establishes performance objectives, metrics, and requirements for developing, implementing, and maintaining a nuclear material control and accountability (MC&A) program within the U.S. Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), and for DOE owned materials at other facilities that are exempt from licensing by the Nuclear Regulatory Commission (NRC). Chg 4 (PgChg) supersedes AdminChg 3, dated 5-15-15. |
pgz |
|
|
|
|
directives |
New - DOE O 331.1D, Employee Performance Management and Recognition Program
|
To establish requirements and responsibilities for the administration of the performance management and recognition program for non-Senior Executive Service (SES) and non-Senior Leader, Professional or Technical (SL/SP/ST) employees. To improve individual and organizational performance, enhance program effectiveness, and ensure accountability by focusing on results, service quality and customer satisfaction, by aligning critical elements with organizational goals and the Department of Energy’s (DOE) Strategic Plan. |
mudijo |
|
|
|
|
directives |
NEW - DOE O 460.1D, Hazardous Materials Packaging and Transportation Safety
|
This Order of the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), establishes safety requirements for the proper packaging and transportation of offsite shipments and onsite transfers of hazardous materials, including radioactive materials. |
mudijo |
|
|
|
|
directives |
Directives Equivalency Approval Memorandum for DOE O 206.2
|
|
mudijo |
|
|
|
|
directives |
NEW - DOE N 251.116, Cancellation of Directives
|
Effective immediately the following Department of Energy directive is canceled.
DOE P 111.1, Departmental Organization Management System, dated 08-27-96 |
mudijo |
|
|
|
|
directives |
DRAFT - DOE O 442.1B - Second Draft, Department of Energy Employee Concerns Program
|
The Order establishes basic criteria and processes to maintain a consistent Employee Concerns Program (ECP) across the Department, including NNSA, that encourages the free and open expression of employee concerns; provides DOE/NNSA federal, contractor, and sub contractor employees with an independent avenue to raise any employee concern as defined in this Order; and supports a strong safety culture where employee concerns can be raised without fear of retaliation. This is a second posting for DOE O 442.1B following organizational changes and transfer of OPI from the Office of Economic Impact and Diversity to the Office of Environment, Health, Safety and Security, which resulted in a rewrite of the text. The author will submit responses to comments on the first draft concurrently with responses on this draft.
|
pgz |
|
|
|
DOE G 225.1A-1 |
directives |
Implementation Guide for Use with DOE O 225.1 Accident Investigations
|
Cancels DOE G 225.1-1. Canceled by DOE O 225.1B. |
dpegram |
Guide |
HS - Office of Health, Safety and Security
|
Nov 26, 1997
|
Archive |
DOE G 436.1-1 |
directives |
Federal Sustainable Print Management
|
The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11, and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade." Does not cancel/supersede other directives. |
JDicus |
Guide |
IM - Office of the Chief Information Officer
|
Nov 17, 2015
|
Current |
|
directives |
New - DOE G 436.1-1, Federal Sustainable Print Management
|
The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11, and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade." |
pgz |
|
|
|
N/A |
directives |
Delegation of Authority to Approve Actual Travel Expense Reimbursements Exemption Action Request
|
|
Administrator |
Organizations' Assignment of Responsibility |
|
Aug 30, 2016
|
Current |
|
directives |
NEW - DOE O 241.1B Chg 1 (Admin Chg), Scientific and Technical Information Management
|
The purpose of this directive is to ensure that STI is appropriately managed as part of the DOE mission to enable the advancement of scientific knowledge and technological innovation. Supersedes DOE O 241.1A and DOE O 241.1A Chg 1. |
mudijo |
|
|
|
002.00Q |
directives |
Delegation to the Under Secretary (of Energy)
|
|
pgz |
Delegation |
|
Nov 01, 2018
|
Rescinded |
29.00A |
directives |
Designation to Theodore Wyka
|
|
pgz |
Designation |
|
Jul 22, 2018
|
Rescinded |
002.17-09C |
directives |
Redelegation/Designation to Norbert S. Doyle as Head of Contracting Activity for the Office of Environmental Management
|
|
mudijo |
Re-delegation |
|
Dec 21, 2017
|
Rescinded |
002.17-09D |
directives |
Redelegation/Designation to Angela S. Watmore as Head of Contracting Activity (HCA) for the Office of Environmental Management
|
|
mudijo |
Re-delegation |
|
Sep 10, 2018
|
Rescinded |
DOE 1300.2 |
directives |
Department of Energy Standards Program
|
This Order establishes general policy guidelines, authorities and responsibilities for DOE standards programs
and guidelines for participation in private sector standards organizations. Superseded by DOE 1300.2A. |
pgz |
Order |
EH - Office of Environment, Safety and Health
|
Dec 18, 1980
|
Archive |
DOE O 420.1C Chg 2 (MinChg) |
directives |
Facility Safety
|
The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. This Page Change is limited in scope to changes necessary to invoke DOE-STD-1104, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, and revised DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis as required methods. Supersedes DOE O 420.1C Chg1 (PgChg). |
pguha |
Order |
AU - Office of Environment, Health, Safety and Security
|
Dec 04, 2012
|
Archive |
|
directives |
Redirect for Departmental Element list
|
|
mudijo |
|
|
|
|
directives |
Draft - DOE O 313.1A, Management and Funding of the Department’s Overseas Presence
|
The Order delineates DOE and NNSA requirements and responsibilities governing DOE's Overseas Presence in order to effectively implement U.S. national security objectives concerning energy security, nuclear security, and scientific discovery and innovation overseas through the presence of qualified DOE employees and contractors. |
pgz |
|
|
|
DOE O 313.1A |
directives |
Management and Funding of the Department's Overseas Presence
|
The Order delineates DOE and NNSA requirements and responsibilities governing DOE's Overseas Presence in order to effectively implement U.S. national security objectives concerning energy security, nuclear security, and scientific discovery and innovation overseas through the presence of qualified DOE employees and contractors. |
lsmiley |
Order |
NA - National Nuclear Security Administration
|
Jan 11, 2016
|
Draft - for Review |
DOE G 413.3-10A Chg 1 (Admin Chg) |
directives |
Earned Value Management System (EVMS)
|
To support DOE's initiatives to improve program, project, and contract management through the implementation and surveillance of a contractor's Earned Value Management System (EVMS) that is in conformance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the American National Standards Institute/Electronic Industries Alliance (ANSI/EIA)-748-B, Earned Value Management System (or as required by contract), and Federal Acquisition Regulation (FAR) 52.234-4, Earned Value Management System (EVMS). Admin Chg 1 dated 10-22-2015. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Mar 13, 2012
|
Archive |
DOE G 413.3-16A Chg 1 (Admin Chg) |
directives |
Project Completion/Closeout Guide
|
This Guide is developed to provide processes and information for project Closeout. It is based on the principles and requirements taken from DOE O 413.3B. This Guide addresses project transition to operations, lessons learned, physical closeout, and financial closeout. Admin Chg 1 dated 10-22-2015. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Oct 26, 2011
|
Current |
DOE G 413.3-17 Chg 1 (Admin Chg) |
directives |
Mission Need Statement
|
This Guide provides authors of mission need statements, as identified in DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06 with suggested content, definitions, and examples for writing a clear statement to support an acquisition executive's decision to initiate exploration of options to fulfill a capability gap, which may include a capital asset acquisition. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jun 20, 2008
|
Current |
DOE G 413.3-18A Chg 1 (Admin Chg) |
directives |
Integrated Project Team Guide for Formation and Implementation
|
The guide provides detailed guidance of the preferred processes to form and implement an Integrated Project Team (IPT) in support of proper project execution as prescribed in DOE O 413.3B. Admin Chg 1 dated 10-22-2015. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Feb 03, 2012
|
Current |
DOE G 413.3-21 Chg 1 (Admin Chg) |
directives |
Cost Estimating Guide
|
This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. |
rsanchez |
Guide |
PM - Office of Project Management Oversight and Assessments
|
May 09, 2011
|
Archive |
|
directives |
Department of Energy Procedures for Intelligence Activities
|
|
mudijo |
|
|
|
001.02A |
directives |
Redelegation to the Administrator of the Southeastern Power Administration
|
|
mudijo |
Re-delegation |
|
Feb 08, 2011
|
Rescinded |
|
directives |
Approval Memorandum for Policies, Notices and Orders
|
|
pgz |
|
|
|
002.17-06A |
directives |
Redelegation/Designation to Tracey A. Lebeau as Head of Contracting Activity (HCA) for the Western Area Power Administration
|
|
mudijo |
Re-delegation |
|
Jan 02, 2018
|
Rescinded |
002.18 |
directives |
Redelegation to the Associate Under Secretary for Environment, Health, Safety, and Security
|
|
Asministrator |
Re-delegation |
|
Aug 14, 2014
|
Rescinded |
|
directives |
NEW - DOE P 454.1 Chg 1 (Admin Chg), Use of Institutional Controls
|
The Policy ensures that the Department of Energy will use institutional controls in the management of resources, facilities and properties under its control, and in implementing its programmatic responsibilities. Certified 1-28-11. Supersedes DOE P 454.1, dated 4-9-03. |
pgz |
|
|
|
|
directives |
DRAFT - DOE O 151.1D, Comprehensive Emergency Management System
|
To provide the Department of Energy policy for the development, management, and administration of the DOE Emergency Management System. |
mudijo |
|
|
|
|
directives |
Request to Cancel DOE G 481.1-1, Department of Energy Work for Others Guide, dated September 24, 1997
|
By Cancelling this directive DOE is reducing duplicative publications of program related information and recognizing the effects of DOE/contractor working groups and the use of previously unavailable electronic communication systems. |
mudijo |
|
|
|
|
directives |
Request to Cancel Department of Energy (DOE) Order, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area, dated May 31, 2011
|
DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions. |
mudijo |
|
|
|
|
directives |
Notice of Intent to Revise DOE O 341.1, Federal Employee Health Services
|
To change Bonneville Power Administration's status to being covered by the order, institutionalize a current requirement to use the Department of Labor's (DOL's) "encomp" process to file a workers' compensation claim, and make minor updates, e.g., for organizational titles and internet links. |
mudijo |
|
|
|
014.00B |
directives |
Delegation to the Executive Director, Loan Programs Office
|
|
mudijo |
Delegation |
|
Feb 20, 2018
|
Rescinded |
DOE O 140.1 |
directives |
Interface with the Defense Nuclear Facilities Safety Board
|
The purpose of this Order is to emphasize line management accountability and establish clear requirements and responsibilities when working with the Defense Nuclear Facilities Safety Board (DNFSB). Cancels DOE M 140.1-1B. Canceled by DOE O 140.1A. |
mdo |
Order |
AU - Office of Environment, Health, Safety and Security
|
May 14, 2018
|
Archive |
|
directives |
New - DOE O 140.1, Interface with the Defense Nuclear Facilities Safety Board
|
The purpose of this Order is to emphasize line management accountability and establish clear requirements and responsibilities when working with the Defense Nuclear Facilities Safety Board (DNFSB). Cancels DOE M 140.1-1B
|
pgz |
|
|
|
DOE P 547.1A |
directives |
Small Business First Policy
|
To establish a Small Business Policy that reinforces the goals of the Small Business Act (Public Law 85-536, as amended), Small Business Jobs Act of 2010, and other applicable laws, Executive Orders, regulations and best business practices. This Policy will provide DOE’s principles for engagement with the Nation’s small business community. The Policy was updated to clarify and expand on the mission of the Office of Small and Disadvantaged Business Utilization. Supersedes DOE P 547.1. |
khibben |
Policy |
SB - Office of Small and Disadvantaged Business Utilization
|
Mar 30, 2018
|
Current |
|
directives |
New - DOE P 547.1A, Small Business First Policy
|
To establish a Small Business Policy that reinforces the goals of the Small Business Act (Public Law 85-536, as amended), Small Business Jobs Act of 2010, and other applicable laws, Executive Orders, regulations and best business practices. This Policy will provide DOE’s principles for engagement with the Nation’s small business community. The Policy was updated to clarify and expand on the mission of the Office of Small and Disadvantaged Business Utilization. Supersedes DOE P 547.1. |
pgz |
|
|
|
DOE P 451.1 |
directives |
National Environmental Policy Act Compliance Program
|
This Policy establishes DOE’s expectations for implementing the National Environmental Policy Act of 1969 (NEPA); the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR Parts 1500-1508); and the DOE NEPA Implementing Procedures (10 CFR Part 1021). |
NSubramanian |
Policy |
GC - Office of General Counsel
|
Dec 21, 2017
|
Current |
25.00B |
directives |
Designation to the Director, Office of Management
|
|
mudijo |
Designation |
|
Jul 17, 2018
|
Rescinded |
|
directives |
Approval Memo to Cancel Orders and Policies
|
|
mudijo |
|
|
|
|
directives |
Approval Memo to Cancel Guides
|
|
mudijo |
|
|
|
|
directives |
Approval Memo for Administrative Changes
|
|
mudijo |
|
|
|
002.17-02A |
directives |
Redelegation/Designation to Lisa Nicholson as Head of Contracting Activity (HCA) When Serving as the Acting Project Manager for the Strategic Petroleum Reserve Project Management Office
|
|
mudijo |
Re-delegation |
|
Jul 19, 2018
|
Rescinded |
|
directives |
New - DOE O 420.1C Chg 2 (MinChg), Facility Safety
|
The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. This Page Change is limited in scope to changes necessary to invoke DOE-STD-1104, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, and revised DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis as required methods. Supersedes DOE O 420.1C Chg1 (PgChg). |
mudijo |
|
|
|
002.17-01 |
directives |
Redelegation/Designation to Grace M. Bochenek As Head of Contracting Activity (HCA) for the National Energy Technology Laboratory
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-02 |
directives |
Redelegation/Designation to William C. Gibson, Jr. as Head of Contracting Activity (HCA) for the Strategic Petroleum Reserve Project Management Office
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-03 |
directives |
Redelegation/Designation to John Meeker as Head of Contracting Activity (HCA) for the Golden Field Office
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-04 |
directives |
Redelegation/Designation to Joel W. Seymour as Head of Contracting Activity (HCA) for the Southeastern Power Administration
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-05 |
directives |
Redelegation/Designation to Joseph A. McBrearty as Head of Contracting Activity (HCA) for the Office of Science
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-06 |
directives |
Redelegation/Designation to Anthony H. Montoya as Head of Contracting Activity (HCA) for the Western Area Power Administration
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-07 |
directives |
Redelegation/Designation to Mark C. Brady as Head of Contracting Activity (HCA) for the Office of Headquarters Procurement Services
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-08 |
directives |
Redelegation/Designation to Richard B. Provencher as Head of Contracting Activity (HCA) for the Idaho Operations Office
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-09 |
directives |
Redelegation/Designation to John E. Surah as Head of Contracting Activity (HCA) for the Office of Environmental Management
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-10 |
directives |
Redelegation/Designation to Scott Carpenter as Head of Contracting Activity (HCA) for the Southwestern Power Administration
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
002.17-12 |
directives |
Redelegation/Designation to Shane M. Kosinski as Head of Contracting Activity (HCA) for the Advanced Research Projects Agency-Energy
|
|
mudijo |
Re-delegation |
|
Apr 18, 2016
|
Rescinded |
DOE O 452.3A |
directives |
Management of the Department of Energy Nuclear Security Enterprise
|
The Order defines and affirms the authorities and responsibilities of the National Nuclear Security Administration (NNSA) for the management of the Department of Energy Nuclear Weapons Complex and emphasizes that the management of the United States nuclear weapons stockpile is the DOE's highest priority for the NNSA and the DOE Nuclear Weapons Complex. |
sschwartz |
Order |
NA - National Nuclear Security Administration
|
Jun 06, 2016
|
Draft - for Review |
29.00 |
directives |
Designation to Patrick T. Cahalane
|
|
mudijo |
Designation |
|
May 01, 2016
|
Rescinded |
DOE N 251.114 |
directives |
Cancellation of Directive
|
Cancellation of DOE G 481.1-1, Work for Others Guide, dated 9-24-97. |
ageary |
Cancellation Notice |
MA - Office of Management
|
Mar 04, 2016
|
Archive |
|
directives |
New - DOE N 251.114, Cancellation of DOE Directive
|
Cancellation of DOE G 481.1-1, Work for Others Guide, dated 9-24-97 |
pgz |
|
|
|
022.10 |
directives |
Delegation of Authority/Designation as Head of Contracting Activity for the Southwestern Power Administration
|
|
johnsonmd |
Re-delegation |
|
May 04, 2012
|
Rescinded |
022.09 |
directives |
Delegation of Authority/Designation as Head of Contracting Activity (HCA) for the Office of Environmental Management
|
|
johnsonmd |
Re-delegation |
|
Jan 21, 2011
|
Rescinded |
022.08 |
directives |
Delegation of Authority/Designation as Head of Contracting Activity (HCA) for the Idaho Operations Office
|
|
johnsonmd |
Re-delegation |
|
Sep 24, 2010
|
Rescinded |
DOE 5480.4 |
directives |
Environmental Protection, Safety, and Health Protection Standards
|
The Order specifies and provides requirements for the application of the mandatory environmental protection, safety, and health (ES&H) standards applicable to all Department of Energy (DOE) and DOE contractor operations; provides a listing of reference ES&H standards; and identifies the sources of the mandatory and reference ES&H standards. Cancels DOE 5480.1A. |
bmcarthur |
Order |
AU - Office of Environment, Health, Safety and Security
|
May 15, 1984
|
Archive |
002.17-07A |
directives |
Redelegation/Designation to Thomas Dussault as Head of Contracting Activity (HCA) for the Office of Headquarters Procurement Services
|
|
pgz |
Re-delegation |
|
Sep 01, 2017
|
Rescinded |
002.17-09E |
directives |
Redelegation/Designation to Paul Bosco as Head of Contracting Activity (HCA) for the Office of Environmental Management
|
|
mudijo |
Re-delegation |
|
Nov 20, 2018
|
Rescinded |
002.17-09A |
directives |
Redelegation/Designation to Ralph E. Holland as Head of Contracting Activity (HCA) for the Office of Environmental Management
|
|
mudijo |
Re-delegation |
|
Jul 25, 2016
|
Rescinded |
DOE G 413.3-9A |
directives |
Project Reviews for Capital Asset Projects
|
This Guide is a tool for federal project directors (FPDs), integrated project teams and federal program managers in planning and executing project reviews outlined in DOE O 413.3B. It addresses the reviews that are conducted from outside the project team during the lifecycle of a project based on the critical decision (CD) milestones, complexity, and duration of a project. Supersedes DOE G 413.3-9 Chg1 (AdminChg) |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Sep 14, 2018
|
Current |
07.00E |
directives |
Designation to Scott Whiteford
|
Authority delegated to Scott Whiteford to serve as the Senior Real Property Officer of the Department of Energy |
mudijo |
Designation |
|
Feb 15, 2017
|
Rescinded |
DOE G 424.1-1B Chg 2 (Admin Chg) |
directives |
Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements
|
This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, “Unreviewed Safety Question Process,” of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Admin Chg 2, dated 6-12-13, supersedes DOE G 424.1-1B Admin Chg 1. Canceled by DOE G 424.1-1C. |
cgarzon |
Guide |
EH - Office of Environment, Health, Safety and Security
|
Apr 08, 2010
|
Archive |
DOE O 425.1D Chg 1 (Admin Chg) |
directives |
Verification of Readiness to Start Up or Restart Nuclear Facilities
|
The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Adm Chg 1, dated 4-2-13, supersedes DOE O 425.1D. |
JShaw |
Order |
AU - Office of Environment, Health, Safety and Security
|
Apr 16, 2010
|
Archive |
DOE O 331.1D Chg 1 (MinChg) |
directives |
Employee Performance Management and Recognition Program
|
To establish requirements and responsibilities for the administration of the performance management and recognition program for non-Senior Executive Service (SES) and non-Senior Leader, Professional or Technical (SL/SP/ST) employees. To improve individual and organizational performance, enhance program effectiveness, and ensure accountability by focusing on results, service quality and customer satisfaction, by aligning critical elements with organizational goals and the Department of Energy’s (DOE) Strategic Plan. Supersedes DOE O 331.1D. |
lbuckner |
Order |
HC - Office of the Chief Human Capital Officer
|
Dec 16, 2016
|
Archive |
DOE O 342.1A |
directives |
Agency Administrative Grievance Policy and Procedures
|
This Order provides general requirements, instructions, and responsibilities for administering the Department of Energy's administrative grievance system. Supersedes DOE O 342.1. |
jackerman |
Order |
HC - Office of the Chief Human Capital Officer
|
Jul 09, 2018
|
Current |
|
directives |
New - DOE P 411.2A, DOE Scientific Integrity Policy
|
The policy is intended to enhance our culture by establishing a unified framework for scientific integrity. Supersedes DOE P 411.2. |
pgz |
|
|
|
|
directives |
New - DOE O 411.2, Scientific Integrity
|
This Order implements DOE P 411.2A to ensure a culture of scientific integrity and facilitate free flow of scientific and technical information. Does not cancel/supersede other directives |
pgz |
|
|
|
DOE O 251.1D |
directives |
Departmental Directives Program
|
The Order establishes directives as the primary means to set, communicate, and institutionalize policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Supersedes DOE O 251.1C. |
RMack |
Order |
MA - Office of Management
|
Jan 17, 2017
|
Archive |
DOE O 415.1 Chg 2 (MinChg) |
directives |
Information Technology Project Management
|
The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. These changes implement The Federal Information Technology Acquisition Reform Act (FITARA) Supersedes DOE O 415.1 Admin Chg 1. |
Denise Hill |
Order |
IM - Office of the Chief Information Officer
|
Dec 03, 2012
|
Current |
|
directives |
New - DOE O 415.1 Chg 2 (MinChg), Information Technology Project Management
|
The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. These changes implement The Federal Information Technology Acquisition Reform Act (FITARA) Supersedes DOE O 415.1 Admin Chg 1.
|
pgz |
|
|
|
DOE O 415.1 Admin Chg 1 |
directives |
Information Technology Project Management
|
The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Superseded by DOE O 415.1 Chg 2 (MinChg). |
dhill |
Order |
IM - Office of the Chief Information Officer
|
Dec 03, 2012
|
Archive |
|
directives |
New - DOE O 426.1A, Federal Technical Capability Program
|
To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Supersedes DOE O 426.1. |
mudijo |
|
|
|
|
directives |
New - DOE O 450.2 Chg 1 (MinChg), Integrated Safety Management
|
To ensure that the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), systematically integrates safety into management and work practices at all levels, so that missions are accomplished efficiently while protecting the workers, the public, and the environment. Supersedes DOE O 450.2, dated 4-24-2011. |
mudijo |
|
|
|
|
directives |
New - DOE O 541.1C, Appointment of Contracting Officers and Contracting Officer Representatives
|
To establish procedures governing the selection, appointment, and termination of all components of Department of Energy (DOE), including National Nuclear Security Administration contracting officers (COs) by ensuring federal staff are developed appropriately, in accordance with the Office of Federal Procurement Policy (OFPP) memorandum on May 7, 2014, entitled “Revisions to the Federal Acquisition Certification in Contracting (FAC-C).” Supersedes DOE O 541.1B, dated 4-21-2004. |
mudijo |
|
|
|
DOE N 251.118 |
directives |
Cancellation of Directives
|
Cancellation of DOE O 580.1A, Department of Energy Personal Property Management Program, dated 10-22-12. |
estanton |
Cancellation Notice |
MA - Office of Management
|
Jan 17, 2017
|
Archive |
|
directives |
New - DOE O 142.3A Chg 1 (MinChg), Unclassified Foreign Visits and Assignments Program
|
The order defines a program for unclassified foreign national access to DOE sites, information, technologies, and equipment. Supersedes DOE O 142.3A |
mudijo |
|
|
|
|
directives |
New - DOE N 251.118, Cancellation of Directives
|
Cancellation of DOE O 580.1A, Department of Energy Personal Property Management Program, dated 10-22-12. |
mudijo |
|
|
|
|
directives |
New - DOE O 470.4B Chg 2 (MinChg), Safeguards and Security Program
|
The order establishes responsibilities and program planning and management requirements for the Safeguards and Security Program. Supersedes DOE O 470.4B Chg 1. |
pgz |
|
|
|
DOE O 426.1A |
directives |
Federal Technical Capability Program
|
To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Supersedes DOE O 426.1.Superseded by DOE O 426.1A Chg1 MinChg |
jyarrington |
Order |
AU - Office of Environment, Health, Safety and Security
|
Jan 17, 2017
|
Archive |
DOE O 522.1A |
directives |
Pricing of Departmental Materials and Services
|
The order sets forth requirements for establishing prices and charges for materials and services sold or provided to external organizations, other Federal agencies, and the private sector either directly or through the Department's site/facility management contracts. Supersedes DOE O 522.1. |
mgarcia |
Order |
CF - Office of the Chief Financial Officer
|
Aug 02, 2018
|
Current |
|
directives |
New - DOE O 522.1A, Pricing of Departmental Materials and Services
|
The order sets forth requirements for establishing prices and charges for materials and services sold or provided to external organizations, other Federal agencies, and the private sector either directly or through the Department's site/facility management contracts. Supersedes DOE O 522.1.
|
pgz |
|
|
|
|
directives |
DOE O 413.2C Chg1 (MinChg), Laboratory Directed Research and Development
|
To establish Department of Energy (DOE) requirements for laboratory directed research and development (LDRD) while providing the laboratory director broad flexibility for program implementation. Supersedes DOE O 413.2C.
|
pgz |
|
|
|
DOE O 205.1B Chg 3 (PgChg) |
directives |
Department of Energy Cyber Security Program
|
The order sets forth requirements and responsibilities for a Departmental Cyber Security Program (CSP) that protects information and information systems for the Department of Energy (DOE). Chg 1 dated 12-7-2012; Chg 2 dated 3-11-2013; Chg 3, dated 4-29-2014, supersedes Chg 2. |
sfarrand |
Order |
IM - Office of the Chief Information Officer
|
May 16, 2011
|
Archive |
DOE O 241.1B Chg 1 (Admin Chg) |
directives |
Scientific and Technical Information Management
|
The purpose of this directive is to ensure that STI is appropriately managed as part of the DOE mission to enable the advancement of scientific knowledge and technological innovation. Supersedes DOE O 241.1B. |
jgilmore |
Order |
SC - Office of Science
|
Dec 13, 2010
|
Current |
003.03-01A |
directives |
Delegation to Deputy Administrator for Naval Reactors; Director, Office of Nuclear Incident Response; Assistant Deputy Administrator for Secure Transportation; Manager, Kansas City Field Office; Manager, Livermore Field Office; Manager, Los Alamos Field Office; Manager, Nevada Field Office; Manager, NNSA Production Office; Manager, Sandia Field Office; Manager, Savannah River Field Office
|
|
mudijo |
Re-delegation |
|
Nov 30, 2016
|
Rescinded |
|
directives |
DRAFT - DOE O 470.3C, Design Basis Threat (DBT) Policy
|
The DBT Policy (formerly Graded Security Protection (GSP) Policy) establishes intelligence community informed security performance metrics but is not a threat statement or an intelligence assessment. The policy is designed to represent a stable set of goals for the planning and implementation of Departmental safeguards and security programs for the next 3 - 5 years. The policy embodies risk management by defining the parameters of credible threats that must be addressed, further adjustments to Department-wide performance standards may be justified by specific site and/or mission imperatives. DOE’s security risk management philosophy is based on establishing and maintaining a graded approach and defense-in-depth safeguards and security program. Several factors were identified during the 2015 GSP annual review which highlighted the need to update the policy in terms of the risk management considerations, which include the consequence posed by the loss, theft, and/or unauthorized use of an asset; intelligence pertaining to current and future objectives and characteristics of adversaries. The 2008 GSP policy is beyond the predicated intelligence life-cycle and requires a revision. |
mudijo |
|
|
|
DOE P 470.1B |
directives |
Safeguards and Security Program
|
The Safeguards and Security Program ensures that the Department of Energy efficiently and effectively meets all its obligations to protect Special Nuclear Material, other nuclear materials, classified matter, sensitive information, government property and facilities, and the safety and security of employees, contractors, and the general public. Supersedes DOE P 470.1A. |
mbrooks |
Policy |
EH - Office of Environment, Health, Safety and Security
|
Feb 10, 2016
|
Current |
|
directives |
New - DOE P 470.1B, Safeguards and Security Program
|
The Safeguards and Security Program ensures that the Department of Energy efficiently and effectively meets all its obligations to protect Special Nuclear Material, other nuclear materials, classified matter, sensitive information, government property and facilities, and the safety and security of employees, contractors, and the general public. |
pgz |
|
|
|
|
directives |
Fast Track Directives Process
|
|
mudijo |
|
|
|
DOE O 1540.1 |
directives |
Materials Transportation and Traffic Management
|
To establish Department of Energy (DOE) policies and procedures for the management of materials transportation activities, including
traffic management, for other than intrabuilding and intrasite transfers. |
mudijo |
Order |
DP - Office of Defense Programs
|
May 03, 1982
|
Archive |
DOE O 456.1A |
directives |
The Safe Handling of Unbound Engineered Nanoparticles
|
The Order establishes requirements and assigns responsibilities for activities involving unbound engineered nanoparticles (UNP) to ensure that work involving UNP occurs in a safe and secure manner that protects workers, the public, and the environment. |
rkeeler |
Order |
EH - Office of Environment, Health, Safety and Security
|
Jul 15, 2016
|
Current |
DOE O 450.2, Chg 1 (MinChg) |
directives |
Integrated Safety Management
|
To ensure that the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), systematically integrates safety into management and work practices at all levels, so that missions are accomplished efficiently while protecting the workers, the public, and the environment. Supersedes DOE O 450.2, dated 4-24-2011. |
JDillard |
Order |
EH - Office of Environment, Health, Safety and Security
|
Apr 25, 2011
|
Current |
|
directives |
Rescission of Designation No. 00-026.00 to the Assistant General Counsel for Contractor Human Resources
|
|
mudijo |
|
|
|
|
directives |
Integrated Project Team (IPT) Directives Process
|
The processing time for Directives will be determined by the DRB and approved by the DOE Operations Committee. The Secretary, Deputy Secretary, DOE Operations Committee, or DRB Chair may approve an expedited process for processing directives. |
mudijo |
|
|
|
DOE O 320.1 Chg 1 (PgChg) |
directives |
Acquiring and Positioning Human Resources
|
To establish requirements and responsibilities when sending employees on details outside the Department, determining probationary periods for managers and supervisors, providing part-time career employment, conducting reductions in force, promoting and placing candidates in the competitive service, and conducting some other personnel actions.
Chg 1 (PgChg), dated 11-21-2003, supersedes DOE O 320.1. Canceled by DOE N 251.119, dated 10-20-17. |
jackerman |
Order |
HC - Office of the Chief Human Capital Officer
|
Sep 06, 2002
|
Archive |
DOE O 331.1D |
directives |
Employee Performance Management and Recognition Program
|
To establish requirements and responsibilities for the administration of the performance management and recognition program for non-Senior Executive Service (SES) and non-Senior Leader, Professional or Technical (SL/SP/ST) employees.
To improve individual and organizational performance, enhance program effectiveness, and ensure accountability by focusing on results, service quality and customer satisfaction, by aligning critical elements with organizational goals and the Department of Energy’s (DOE) Strategic Plan. Superseded by DOE O 331.1D Chg 1 (MinChg). |
lbuckner |
Order |
HC - Office of the Chief Human Capital Officer
|
Dec 16, 2016
|
Archive |
DOE G 413.3-21A |
directives |
Cost Estimating Guide
|
This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. Supersedes DOE G 413.3-21 Admin Chg 1. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jun 06, 2018
|
Current |
|
directives |
New - DOE G 413.3-21A, Cost Estimating Guide
|
This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. |
mudijo |
|
|
|
DOE G 413.3-22 |
directives |
Analysis of Alternatives Guide
|
This Guide assists individuals and teams in conducting Analysis of Alternatives (AoA) for capital asset projects and programs consistent with published Government Accountability Office (GAO) best practices. The suggested DOE tailored process uses a systems engineering methodology that integrates requirements analysis based on mission need, identification and analysis of alternatives, risk identification and analysis, and concept exploration in order to evolve a cost effective, preferred alternative to meet a mission need. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jun 06, 2018
|
Current |
|
directives |
New - DOE G 413.3-22, Analysis of Alternatives Guide
|
This Guide assists individuals and teams in conducting Analysis of Alternatives (AoA) for capital asset projects and programs consistent with published Government Accountability Office (GAO) best practices. The suggested DOE tailored process uses a systems engineering methodology that integrates requirements analysis based on mission need, identification and analysis of alternatives, risk identification and analysis, and concept exploration in order to evolve a cost effective, preferred alternative to meet a mission need. |
pgz |
|
|
|
002.17-03B |
directives |
Redelegation/Designation to Derek G. Passarelli as Head of Contracting Activity (HCA) for the Office of Energy Efficiency and Renewable Energy
|
|
mudijo |
Re-delegation |
|
May 30, 2018
|
Rescinded |
DOE O 333.1 Chg 1 (MinChg) |
directives |
Administering Work Force Discipline, Adverse and Performance Based Actions
|
The order provides requirements and responsibilities for administering work force discipline and corrective actions. Supersedes DOE O 333.1. |
jcarter |
Order |
HC - Office of the Chief Human Capital Officer
|
May 14, 2015
|
Current |
|
directives |
Directives Review Board Members
|
|
admin |
|
|
|
|
directives |
References
|
Directives Program References |
admin |
|
|
|
30.00 |
directives |
Designation to Cynthia Hunt
|
|
mudijo |
Designation |
|
Jun 06, 2017
|
Rescinded |
DOE O 430.1B Chg 2 |
directives |
Real Property and Asset Management
|
The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Supersedes DOE O 430.1A Chg 1. |
mudijo |
Order |
MA - Office of Management
|
Sep 24, 2003
|
Archive |
|
directives |
Frequently Asked Questions (FAQs) for DOE O 420.1C, DOE G 420.1-1A, DOE-STD-1022-2012, and DOE-STD-1066-2012
|
Frequently Asked Questions (FAQs) Regarding DOE Order 420.1C, "Facility Safety," and its supporting directives, DOE G 420.1-1A, "Nonreactor Nuclear Safety Design Criteria for use with DOE O 420.1C, Facility Safety," DOE-STD-1020-2012, "Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities," and DOE-STD-1066-2012, "Fire Protection." |
pguha |
|
|
|
|
directives |
Quarterly Update January through March
|
|
mudijo |
|
|
|
|
directives |
Notice of Intent to Revise DOE O 221.2A, Cooperation with the Office of Inspector General
|
It is necessary to update the current version of this directive due to lack of consistent application and understanding of its provisions. DOE employees, program officials and managers, as well as employees of major facilities contractors, have indicated to OIG personnel that the directive, as currently written, is not sufficiently clear with respect to the nature and extent of cooperation with the OIG that is required. |
mudijo |
|
|
|
DOE O 243.1A |
directives |
Records Management Program
|
The Order sets forth requirements and responsibilities for establishing and maintaining a program for the efficient and economical management of records and information assets. |
jdavenport |
Order |
IM - Office of the Chief Information Officer
|
Jul 26, 2011
|
Archive |
DOE O 200.1A |
directives |
Information Technology Management
|
The Order identifies the objectives, components, and responsibilities for implementing processes to ensure the effective management of information and information systems within the Department. Superseded by DOE O 200.1A Chg 1 (MinChg).
Supersedes DOE O 200.1. |
dhill |
Order |
IM - Office of the Chief Information Officer
|
Dec 23, 2008
|
Archive |
DOE O 227.1A |
directives |
Independent Oversight Program
|
The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Supersedes DOE O 227.1. |
ENicoll |
Order |
EA - Office of Independent Enterprise Assessment
|
Dec 21, 2015
|
Archive |
|
directives |
NEW - DOE O 227.1A, Independent Oversight Program
|
The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. |
pgz |
|
|
|
DOE G 415.1-2 |
directives |
Information Technology Project Execution Model Guide for Small and Medium Projects
|
The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives. |
dhill |
Guide |
IM - Office of the Chief Information Officer
|
Dec 21, 2015
|
Current |
|
directives |
New - DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium Projects
|
The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives. |
pgz |
|
|
|
DOE O 329.1A |
directives |
Excepted Service Authorities for EJ and EK Pay Plans
|
The order establishes requirements and responsibilities for the employment and compensation of individuals when using DOE expected service authorities. Supersedes DOE O 329.1. Superseded by DOE O 329.1A Chg 2 (Admin Chg). |
amoultrie |
Order |
HC - Office of the Chief Human Capital Officer
|
Dec 07, 2015
|
Archive |
DOE O 329.1A Chg 1 (Admin Chg) |
directives |
Excepted Service Authorities for EJ and EK Pay Plans
|
The order establishes requirements and responsibilities for the employment and compensation of individuals when using DOE expected service authorities. Supersedes DOE O 329.1A |
amoultrie |
Order |
HC - Office of the Chief Human Capital Officer
|
Dec 07, 2015
|
Archive |
|
directives |
NEW - DOE O 329.1A Chg 1 (Admin Chg), Excepted Service Authorities for EJ and EK Pay Plans
|
The order establishes requirements and responsibilities for the employment and compensation of individuals when using DOE expected service authorities. Supersedes DOE O 329.1A.
|
pgz |
|
|
|
DOE O 473.3A |
directives |
Protection Program Operations
|
The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Supersedes DOE O 473.3. NOTE: Safeguards and Security Alarm Management and Control Systems, of DOE O 473.3, is retained as Attachment 3, Annex 1. |
rfaiver |
Order |
AU - Office of Environment, Health, Safety and Security
|
Mar 23, 2016
|
Archive |
|
directives |
New - DOE O 473.3A, Protection Program Operations
|
The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Supersedes DOE O 473.3. NOTE: Safeguards and Security Alarm Management and Control Systems, of DOE O 473.3, is retained as Attachment 3, Annex 1.
|
pgz |
|
|
|
|
directives |
New - DOE P 434.1B, Conduct and Approval of Select Agent and Toxin Work at Department of Energy Sites
|
The purpose of this policy is to establish the Department’s expectations for the establishment and operation of DOE research laboratories that utilize select agents and toxins (as regulated by the United States Department of Health and Human Services and the United States Department of Agriculture), hereinafter called LABS; and to assess future policy needs through the DOE Biosurety Executive Working Group for the operation, coordination, and oversight of these LABS.
|
Administrator |
|
|
|
DOE O 470.3C |
directives |
Design Basis Threat (DBT) Order
|
This Order is classified (Secret // RD // NOFORN) and will not be available on the Directives portal. This Order cancels and supersedes DOE O 470.3B, Graded Security Protection Policy (U), dated 8-12-08. For distribution, contact Gary White, 301-903-6874, gary.whitejr@hq.doe.gov |
GWhite |
Order |
AU - Office of Environment, Health, Safety and Security
|
Nov 23, 2016
|
Archive |
|
directives |
New - DOE O 470.3C, Design Basis Threat (DBT) Order
|
This Order is classified (Secret // RD // NOFORN) and will not be available on the Directives portal. This Order cancels and supersedes DOE O 470.3B, Graded Security Protection Policy (U), dated 8-12-08. For distribution, contact Mark Hojnacke, 301-903-3311, mark.hojnacke@hq.doe.gov. |
pgz |
|
|
|
002.17-01A |
directives |
Redelegation/Designation to Sean E. Plasynski as Head of Contracting Activity (HCA) for the National Energy Technology Laboratory
|
|
mudijo |
Re-delegation |
|
Mar 01, 2018
|
Rescinded |
006.00D |
directives |
Delegation to the Under Secretary for Science
|
|
mudijo |
Delegation |
|
Oct 12, 2018
|
Rescinded |
DOE O 142.3A Chg 1 (MinChg) |
directives |
Unclassified Foreign Visits and Assignments Program
|
The order defines a program for unclassified foreign national access to DOE sites, information, technologies, and equipment. Supersedes DOE O 142.3A |
jemanuelson |
Order |
AU - Office of Environment, Health, Safety and Security
|
Oct 14, 2010
|
Archive |
DOE O 412.1A Chg 1 (AdminChg) |
directives |
Work Authorization System
|
To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A. |
AGeary |
Order |
MA - Office of Management
|
Apr 21, 2005
|
Current |
DOE O 413.3B Chg 3 (PgChg) |
directives |
Program and Project Management for the Acquisition of Capital Assets
|
The Order provides DOE and NNSA with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change and supports implementation of OMB Circulars A-11, A-123 and A-131. Supersedes DOE O 413.3B Chg 2 (PgChg) |
jglascock |
Order |
PM - Office of Project Management Oversight and Assessments
|
Nov 29, 2010
|
Archive |
DOE O 460.1D |
directives |
Hazardous Materials Packaging and Transportation Safety
|
This Order of the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), establishes safety requirements for the proper packaging and transportation of offsite shipments and onsite transfers of hazardous materials, including radioactive materials. |
jlorence |
Order |
EM - Office of Environmental Management
|
Dec 20, 2016
|
Archive |
DOE P 485.1 |
directives |
Foreign Engagements with DOE National Laboratories
|
The Department is committed to making DOE National Laboratories available to non-DOE entities, including foreign entities, as long as such work is consistent with or complementary to the missions of DOE and the laboratory to which the work is to be assigned, and does not impede the laboratory's ability to successfully accomplish its DOE missions. |
jlabarge |
Policy |
SC - Office of Science
|
Jan 19, 2017
|
Archive |
DOE P 434.1B |
directives |
Conduct and Approval of Select Agent and Toxin Work at Department of Energy Sites
|
The purpose of this policy is to establish the Department’s expectations for the establishment and operation of DOE research laboratories that utilize select agents and toxins (as regulated by the United States Department of Health and Human Services and the United States Department of Agriculture), hereinafter called LABS; and to assess future policy needs through the DOE Biosurety Executive Working Group for the operation, coordination, and oversight of these LABS. |
Robin Keeler |
Policy |
EH - Office of Environment, Health, Safety and Security
|
Nov 25, 2016
|
Current |
DOE P 112.1 |
directives |
DOE Roles and Responsibilities - National Laboratories
|
This Policy provides clarification regarding roles and responsibilities at the Department of Energy (DOE), particularly as they relate to the DOE National Laboratories. |
Administrator |
Policy |
S - Office of the Secretary
|
Nov 23, 2016
|
Current |
DOE O 323.1 Chg 1 (Admin Chg) |
directives |
Garnishment of Federal Employees' Pay
|
The Order prescribes procedures for collecting from an employee's pay those amounts subject to legal process brought for enforcement of the employee's legal obligations to provide child support and/or make alimony payments and commercial garnishments.
Admin Chg 1, dated 6-4-2008, supersedes DOE O 323.1. |
TDouglass |
Order |
CF - Office of the Chief Financial Officer
|
Aug 01, 2004
|
Current |
DOE O 100.1E Chg 1 (Admin Chg) |
directives |
Secretarial Succession, Threat Level Notification, and Successor Tracking
|
This order establishes the Secretarial Order of Succession in the Department of Energy pursuant to section 202(a) of the Department of Energy Organization Act, 42 U.S.C. 7132(a) and establish a mechanism for tracking the locations of successors at the various threat levels. Admin Chg 1, dated 9-13-2013, supersedes DOE O 100.1E. |
acerrone |
Order |
NA - National Nuclear Security Administration
|
Jan 28, 2013
|
Archive |
DOE O 5000.3A |
directives |
Occurrence Reporting and Processing of Operations Information
|
To establish a system for reporting of operations information related to DOE-owned or operated facilities and processing of that information to provide for appropriate corrective action in accordance with the policy set forth in Paragraph of this Order. |
Administrator |
Order |
NE - Office of Nuclear Energy
|
May 30, 1990
|
Archive |
DOE O 551.1D Chg 1 (PgChg) |
directives |
Official Foreign Travel
|
The order establishes DOE requirements and responsibilities governing official foreign travel by Federal and contractor employees. The Pg Chg removes the requirement to surrender official passports and replaces it with a process that requires travelers be responsible for safeguarding theirown official passports. Supersedes DOE O 551.1D, dated 4-12-12. Superseded by DOE O 551.1D Chg 2 (Minor Revision). |
uthorne |
Order |
MA - Office of Management
|
Apr 02, 2012
|
Archive |
DOE O 551.1D Chg 2 (Minor Revision) |
directives |
Official Foreign Travel
|
The order establishes DOE requirements and responsibilities governing official foreign travel by Federal and contractor employees. The proposed revisions to the Official Foreign Travel Order align it with established
leave policy and update organizational responsibilities. Supersedes DOE O 551.1D Chg 1 (Pg Chg). |
uthorne |
Order |
MA - Office of Management
|
Apr 02, 2012
|
Archive |
|
directives |
New - DOE O 456.1A, The Safe Handling of Unbound Engineered Nanoparticles
|
The Order establishes requirements and assigns responsibilities for activities involving unbound engineered nanoparticles (UNP) to ensure that work involving UNP occurs in a safe and secure manner that protects workers, the public, and the environment. |
pgz |
|
|
|
DOE O 461.1C |
directives |
Packaging and Transportation for Offsite Shipment of Materials of National Security Interest
|
The purpose of this Order is to make clear that the packaging and transportation of all offsite shipments of Materials of National Security Interest (MNSI) for DOE must be conducted in accordance with Department of Transportation (DOT) and Nuclear Regulatory Commission (NRC) regulations that would be applicable to comparable commercial shipments, except where an alternative course of action is identified in this Order. Superseded by DOE O 461.1C Chg1 (MinChg) |
mweber |
Order |
NA - National Nuclear Security Administration
|
Jul 20, 2016
|
Archive |
|
directives |
New - DOE O 461.1C, Packaging and Transportation for Offsite Shipment of Materials of National Security Interest
|
The purpose of this Order is to make clear that the packaging and transportation of all offsite shipments of Materials of National Security Interest (MNSI) for DOE must be conducted in accordance with Department of Transportation (DOT) and Nuclear Regulatory Commission (NRC) regulations that would be applicable to comparable commercial shipments, except where an alternative course of action is identified in this Order. |
mudijo |
|
|
|
DOE O 483.1B |
directives |
DOE Cooperative Research and Development Agreements
|
The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Cancels DOE O 483.1A |
jlucas |
Order |
GC - Office of General Counsel
|
Dec 20, 2016
|
Archive |
|
directives |
New - DOE O 483.1B, DOE Cooperative Research and Development Agreements
|
The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. |
mudijo |
|
|
|
|
directives |
New - DOE O 443.1B Chg1 (PgChg), Protection of Human Research Subjects
|
The Order establishes DOE-specific policy and principles for the protection of human subjects involved in DOE research, and DOE procedures and responsibilities for implementing the policy and requirements set forth in Title 45 Code of Federal Regulations (CFR) Part 46, Protection of Human Subjects, and 10 CFR Part 745, Protection of Human Subjects. Supersedes DOE O 443.1B.
|
pgz |
|
|
|
|
directives |
Recently Approved Justification Memoranda
|
The following approved Justification Memos have been added to the DOE Directives Portal: |
mudijo |
|
|
|
DOE G 413.3-13 Chg 1 (Admin Chg) |
directives |
U.S. Department of Energy Acquisition Strategy Guide for Capital Asset Projects
|
This guide serves as a tool for federal project directors (FPDs) and the Integrated Project Team (IPT) for developing a project acquisition strategy document. The DOE O 413.3A requires the development and approval of the acquisition strategy for projects with total project cost (TPC) of $20M or greater, as part of the Critical Decision-1 (CD-1), Approve L |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jul 22, 2008
|
Current |
DOE G 413.3-15 Chg 1 (Admin Chg) |
directives |
Department of Energy Guide for Project Execution Plans
|
The scope of this guide includes basic aspects of the development and maintenance of the plan for projects of any size and complexity for the benefit of the federal project director, who is approved by the acquisition executive, and incorporates contractor input as appropriate. Integrated project teams, program managers (if applicable), program offices, acquisition executives, and contractor project managers can also benefit from the suggestions in this guide. Admin Chg 1 dated 10-22-2015. |
jmakepeace |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Sep 12, 2008
|
Archive |
DOE G 413.3-19 Chg 2 (Admin Chg) |
directives |
Staffing Guide for Project Management
|
This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Admin Chg 1, dated 10-12-11, cancels DOE G 413.3-19. Admin Chg 2 dated 10-22-2015. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jun 03, 2010
|
Current |
DOE G 413.3-20 Chg 1 (Admin Chg) |
directives |
Change Control Management Guide
|
The Guide provides a suggested approach and uniform guidance for managing project and contract changes through applying the requirements of DOE O 413.3B. Admin Chg 1 dated 10-22-2015. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jul 29, 2011
|
Current |
|
directives |
Notice of Intent to Revise DOE Order 470.3B, Graded Security Protection (GSP) Policy
|
Request approval to revise the subject Order to make significant changes which are required for the Order to be consistent with threat information received from the intelligence community. Information provided by the joint DOE/IN and Defense Intelligence Agency, Nuclear Security Threat Capabilities Assessment, revealed the need to adjust adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations. |
mudijo |
|
|
|
|
directives |
New - DOE O 221.1B, Reporting Fraud, Waste and Abuse to the Office of Inspector General
|
To establish requirements and responsibilities for reporting fraud, waste, abuse, misuse, corruption, criminal acts, and mismanagement to the Department of Energy (DOE), Office of Inspector General (OIG). |
Admin |
|
|
|
|
directives |
Draft - DOE O 470.4B Chg 2 (PgChg), Safeguards and Security Program
|
Only redlined text inserted for the Page Change is available for comment. To review the changes in context, see the PDF Document for Review (upper right). This proposed Page Change institutionalizes the direction found in the S1 Secretarial Memorandum, Strategy of Reforms to Enhance Security, Independent Assessments, Safety and Health Functions, dated February 12, 2014. |
mudijo |
|
|
|
|
directives |
New - DOE G 413.3-9A, Project Reviews for Capital Asset Projects
|
This Guide is a tool for federal project directors (FPDs), integrated project teams and federal program managers in planning and executing project reviews outlined in DOE O 413.3B. It addresses the reviews that are conducted from outside the project team during the lifecycle of a project based on the critical decision (CD) milestones, complexity, and duration of a project. |
mudijo |
|
|
|
|
directives |
New - DOE G 413.3-15A, Project Execution Plans
|
The scope of this guide includes basic aspects of the development and maintenance of the plan for projects of any size and complexity for the benefit of the federal project director, who is approved by the acquisition executive, and incorporates contractor input as appropriate. Integrated project teams, program managers (if applicable), program offices, acquisition executives, and contractor project managers can also benefit from the suggestions in this guide. Supersedes DOE G 413.3-15 Chg1 (AdminChg).
|
pgz |
|
|
|
DOE G 413.3-15A |
directives |
Project Execution Plans
|
The scope of this guide includes basic aspects of the development and maintenance of the plan for projects of any size and complexity for the benefit of the federal project director, who is approved by the acquisition executive, and incorporates contractor input as appropriate. Integrated project teams, program managers (if applicable), program offices, acquisition executives, and contractor project managers can also benefit from the suggestions in this guide. Supersedes DOE G 413.3-15 Chg1 (AdminChg). |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Sep 14, 2018
|
Current |
|
directives |
Draft - DOE O 426.2A, Personnel Selection, Training, Qualifications, Certification Requirements for DOE Facilities
|
This Order establishes selection, training, qualification, and certification requirements for contractor personnel who can impact the safety basis through their involvement in the operation, maintenance, and technical support of Hazard Category 1, 2, and 3 nuclear facilities. |
mudijo |
|
|
|
DOE O 442.2 Chg 1 (PgChg) |
directives |
Differing Professional Opinions for Technical Issues Involving Environmental, Safety, and Health Technical Concerns
|
This Order establishes the Department of Energy (DOE) Differing Professional Opinion (DPO) process for employees to raise technical concerns related to environment, safety, and health (ES&H) which cannot be resolved using routine processes. Chg 1 supersedes DOE O 442.2 dated 6-29-2011. |
thiltz |
Order |
EH - Office of Environment, Health, Safety and Security
|
Jul 29, 2011
|
Current |
|
directives |
New - DOE O 442.2 Chg 1 (PgChg), Differing Professional Opinions for Technical Issues Involving Environment, Safety, and Health Technical Concerns
|
This Order establishes the Department of Energy (DOE) Differing Professional Opinion (DPO) process for employees to raise technical concerns related to environment, safety, and health (ES&H) which cannot be resolved using routine processes. Chg 1 supersedes DOE O 442.2 dated 6-29-2011. |
mudijo |
|
|
|
|
directives |
New - DOE P 112.1, DOE Roles and Responsibilities - National Laboratories
|
This Policy provides clarification regarding roles and responsibilities at the Department of Energy (DOE), particularly as they relate to the DOE National Laboratories. |
mudijo |
|
|
|
DOE O 430.1C |
directives |
Real Property Asset Management
|
The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Supersedes DOE O 430.1B Chg 2. |
SWhiteford |
Order |
MA - Office of Management
|
Aug 19, 2016
|
Archive |
|
directives |
New - DOE O 430.1C, Real Property Asset Management
|
The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Supersedes DOE O 430.1C Chg 2.
|
pgz |
|
|
|
DOE G 435.1-1 |
directives |
Crosswalk Tables: DOE O 5820.2A vs. DOE O 435.1/M 435.1-1
|
These crosswalk tables have been prepared to assist in understanding how the requirements that are currently in 5820.2A are addressed in the DOE O 435.1 and DOE M 435.1-1. |
lsuttora |
Guide |
EM - Office of Environmental Management
|
Jul 09, 1999
|
Archive |
DOE G 435.1-1 |
directives |
Implementation Guide for Use with DOE M 435.1-1
|
The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1. Separate chapters have been combined to form a single document. Individual chapters have been archived. |
lsuttora |
Guide |
EM - Office of Environmental Management
|
Jul 09, 1999
|
Archive |
DOE G 460.1-1 Att |
directives |
Packaging and Transportation Attachments
|
Attachments to DOE G 460.1-1. The guide and attachments were combined into one document. |
jshuler |
Guide |
EM - Office of Environmental Management
|
Jun 05, 1997
|
Archive |
|
directives |
Justification Memo NNSA
|
|
mudijo |
|
|
|
DOE M 441.1-1 Chg 1 (Admin Chg) |
directives |
Nuclear Material Packaging
|
The manual provides detailed packaging requirements for protecting workers from exposure to nuclear materials stored outside of an approved engineered contamination barrier. Supersedes DOE M 441.1-1, dated 3-7-08. |
JShaw |
Manual |
EH - Office of Environment, Health, Safety and Security
|
Mar 07, 2008
|
Current |
CM |
directives |
Certification for DOE O 484.1 Admin Chg 2
|
DOE O 484.1, Reimbursable Work for the Department of Homeland Security, has been reviewed by the office of Acquisition and Project Management and deemed to be in compliance with related Departmental Directives, Secretarial Delegations, organizational structure, budget guidelines, regulations, standards, OMB guidance,
relevant memoranda of understanding and public laws.
In addition, this directive is not found to cause undue burden (i.e., significant cost impacts, overly prescriptive, redundancy, or excessive reporting requirements) on Departmental elements and contractors. Certified 1/15/2015. |
ageary |
Certification Memo |
MA - Office of Management
|
Jan 15, 2015
|
Archive |
CM |
directives |
Certification for DOE O 452.7
|
DOE O 452.7, Protection of Use Control Vulnerabilities and Designs, dated 5-4-2010, has been reviewed by the Office of Management and Budget and deemed to be in compliance with related Departmental Directives, Secretarial Delegations, organizational structure, budget guidelines, regulations, standards, OMB guidance, relevant memoranda of understanding and public laws. In addition, this directive is not found to cause undue burden (i.e., significant cost impacts, overly prescriptive, redundancy, or excessive reporting requirements) on Departmental
elements and contractors. |
emishoe |
Certification Memo |
MA - Office of Management
|
Jan 15, 2015
|
Archive |
DOE G 413.3-1 Chg 1 (Admin Chg) |
directives |
Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A
|
The goal of this Guide is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies, and tools needed to meet Order 413.3A's requirement that they plan, implement and complete their assigned project(s) using a System Engineering approach. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Sep 23, 2008
|
Current |
022.11A |
directives |
Delegation/Designation to the Director, Office of Asset Management as Head of Contracting Authority (HCA) for Real Property
|
|
mudijo |
Re-delegation |
|
Jan 19, 2016
|
Rescinded |
|
directives |
Draft - DOE O 460.1D, Second Draft, Hazardous Materials Packaging and Transportation Safety
|
The Order establishes safety requirements for the proper packaging and transportation of Department of offsite shipments and onsite transfers of radioactive and other hazardous materials, and for modal transportation. This second draft is based on changes in response to comments on the first draft and additional changes made by the current author. This is an expedited review.
|
pgz |
|
|
|
|
directives |
Draft - DOE O 456.1A, The Safe Handling of Unbound Engineered Nanoparticles
|
The Order establishes requirements and assigns responsibilities for activities involving unbound engineered nanoparticles (UNP) to ensure that work involving UNP occurs in a safe and secure manner that protects workers, the public, and the environment.
|
pgz |
|
|
|
DOE N 443.1 |
directives |
Protection of Human Subjects in Classified Research
|
This notice supplements DOE O 443.1B and 10 CFR Part 745 by addressing the Department of Energy (DOE)-specific requirements for the protection of human subjects involved in research that is classified, in whole or in part. |
ewhite |
Notice |
SC - Office of Science
|
Jan 21, 2016
|
Archive |
|
directives |
New - DOE N 443.1, Protection of Human Subjects in Classified Research
|
This notice supplements DOE O 443.1B and 10 CFR Part 745 by addressing the Department of Energy (DOE)-specific requirements for the protection of human subjects involved in research that is classified, in whole or in part.
|
pgz |
|
|
|
DOE G 413.3-5B |
directives |
Performance Baseline Guide
|
The guide identifies key PB elements, development processes, and practices; describes the context in which DOE PB development occurs; and suggests ways of addressing the critical elements in PB development. |
mfenn |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Feb 03, 2016
|
Draft - for Review |
|
directives |
Draft - DOE G 413.3-5B, Performance Baseline Guide
|
The guide identifies key PB elements, development processes, and practices; describes the context in which DOE PB development occurs; and suggests ways of addressing the critical elements in PB development. |
pgz |
|
|
|
|
directives |
DRAFT - DOE O 552.1A, Travel Policy and Procedures
|
This Order supplements the Federal Travel Regulation which is the principal source of policy for Federal employee travel and relocation matters and establishes DOE M 552.1-1A as the repository for supplementary travel requirements information for the Department of Energy. |
mudijo |
|
|
|
|
directives |
Notice of Intent to Submit Page Changes to Revise DOE O 552.1A, Travel Policy and Procedures
|
A page change is being undertaken to reflect changes in responsibilities brought about by the August 2013 reorganization which transferred travel related functions and systems between the Office of Chief Financial Officer (OCFO) and the Office of Management (MA). |
mudijo |
|
|
|
|
directives |
Notice of Intent to Revise DOE O 430.1B, Real Property Asset Management
|
The proposed revision would update the existing order to enact the Asset Management Plan, institutionalize the recommendations of the Laboratory Operations Board (LOB) working groups on infrastructure, and incorporate government-wide real property policies and practices mandated since 2003. |
mudijo |
|
|
|
|
directives |
Draft - DOE O 436.1A, Departmental Sustainability
|
The order defines requirements and responsibilities for managing sustainability DOE to ensure that the Department carries out its missions in a sustainable manner that addresses national energy security and global environmental challenges, and advances sustainable, efficient and reliable energy for the future; institute wholesale cultural change to factor sustainability and greenhouse gas (GHG) reductions into all DOE corporate management decisions; and ensure that DOE achieves the sustainability goals established in its Strategic Sustainability Performance Plan. |
pgz |
|
|
|
|
directives |
Draft - DOE G 410.2-1, Nuclear Material Disposition
|
This document provides a roadmap for implementing the requirements for disposition of nuclear material as outlined in the U.S. Department of Energy (DOE) Order 410.2, Management of Nuclear Materials, and DOE Order 474.2, Nuclear Material Control and Accountability. This Guide provides the basic framework for the nuclear material disposition process, includes information related to the Programmatic Value Determination (PVD) process, and identifies Discard Limits (DL) for specific low-equity nuclear materials. |
pgz |
|
|
|
|
directives |
Draft - DOE O 522.1A, Pricing of Departmental Materials and Services
|
The order establishes DOE requirements for prices and charges for materials and services sold or provided to external organizations, other Federal agencies, or the private sector either directly or through a Departmental site/facility management contract. |
pgz |
|
|
|
DOE G 413.3-5A Chg 1 (Admin Chg 1) |
directives |
U.S Department of Energy Performance Baseline Guide
|
This guide identifies key Performance Baseline (PB) elements, development processes, and practices; describes the context in which DOE PB development occurs; and suggests ways of addressing the critical elements in PB development. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Sep 23, 2011
|
Current |
DOE O 481.1D |
directives |
Strategic Partnership Projects [Formerly Known as Work for Others (Non-Department of Energy Funded Work)]
|
Strategic Partnership Projects is work performed for non-DOE entities by DOE/(NNSA personnel and/or their respective contractor personnel or the use of DOE/NNSA facilities for work that is not directly funded by DOE/NNSA appropriations. Supersedes DOE O 481.1C Chg2 (Admin Chg). Superseded by DOE O 481.1E. |
ageary |
Order |
MA - Office of Management
|
Dec 05, 2016
|
Archive |
|
directives |
New - DOE O 481.1D, Strategic Partnership Projects [Formerly Known as Work for Others (Non-Department of Energy Funded Work)]
|
Strategic Partnership Projects is work performed for non-DOE entities by DOE/(NNSA personnel and/or their respective contractor personnel or the use of DOE/NNSA facilities for work that is not directly funded by DOE/NNSA appropriations. Supersedes DOE O 481.1C Chg2 (Admin Chg).
|
pgz |
|
|
|
DOE G 430.1-1 |
directives |
Cost Estimating Guide
|
The objective of this Guide is to
improve the quality of cost estimates and further strengthen the DOE program/project
management system. The original 25 separate chapters and three appendices have been combined to create a single document. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Mar 28, 1997
|
Current |
DOE G 460.1-1 |
directives |
Implementation Guide for Use with DOE O 460.1A, Packaging and Transportation Safety
|
This Guide provides information concerning the use of current principles and practices, including regulatory guidance from the U. S. Department of Transportation and the U. S. Nuclear Regulatory Commission, where available, to establish and implement effective packaging and transportation safety programs. Does not cancel/supersede other directives. The guide and attachments have been combined into one document. |
jshuler |
Guide |
EM - Office of Environmental Management
|
Jun 05, 1997
|
Current |
DOE G 460.1-1 |
directives |
Implementation Guide for Use with DOE O 460.1A, Packaging and Transportation Safety
|
This Guide provides information concerning the use of current principles and practices, including regulatory guidance from the U. S. Department of Transportation and the U. S. Nuclear Regulatory Commission, where available, to establish and implement effective packaging and transportation safety programs. Does not cancel/supersede other directives. The guide and attachments were combined into one document. |
jshuler |
Guide |
EM - Office of Environmental Management
|
Jun 05, 1997
|
Archive |
|
directives |
BPA Exemption for DOE O 322.1C
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 331.1C
|
|
mudijo |
|
|
|
|
directives |
BPA Exemption for DOE O 321.1
|
|
mudijo |
|
|
|
|
directives |
NEW - DOE M 441.1-1 Chg 1 (Admin Chg)
|
The manual provides detailed packaging requirements for protecting workers from exposure to nuclear materials stored outside of an approved engineered contamination barrier. Supersedes DOE M 441.1-1, dated 3-7-08. |
mudijo |
|
|
|
DOE O 550.1 |
directives |
Official Travel
|
To supplement the Federal Travel Regulation [41 Code of Federal Regulations (CFR), Parts 300–304], which is the principal source of policy for Federal employee travel and relocation matters, and to establish Department of Energy’s (DOE) requirements and responsibilities governing official foreign travel by contractor employees. |
uthorne |
Order |
MA - Office of Management
|
May 02, 2019
|
Archive |
DOE O 205.1C |
directives |
Department of Energy Cybersecurity Program
|
The purpose is to enable accomplishment of the Department’s mission and fulfill Federal cyber security requirements while allowing Departmental Elements (DEs) programmatic and operational flexibility, enhancing risk management, enabling effective implementation, delegating risk management to the lowest appropriate level, addressing roles and responsibilities, and setting standards for performance across all levels of the Department. Cancels DOE O 205.1B Chg3 (PgChg) |
bwright |
Order |
IM - Office of the Chief Information Officer
|
May 15, 2019
|
Archive |
|
directives |
New - DOE O 205.1C, Department of Energy Cyber Security Program
|
The purpose is to enable accomplishment of the Department’s mission and fulfill Federal cybersecurity requirements while allowing Departmental Elements (DEs) programmatic and operational flexibility, enhancing risk management, enabling effective implementation, delegating risk management to the lowest appropriate level, addressing roles and responsibilities, and setting standards for performance across all levels of the Department.
|
pgz |
|
|
|
DOE G 413.3-12 Chg 1 (Admin Chg) |
directives |
U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects
|
This DOE Guide provides a tailored model of the CII PDRI for traditional construction projects for use by the DOE programs, as it may apply and is appropriate, when reviewing the levels of adequacy of project scope definition during the project development stages. Admin Chg 1 dated 10-22-2015. |
MFrank |
Guide |
PM - Office of Project Management Oversight and Assessments
|
Jul 22, 2010
|
Archive |
DOE O 481.1E |
directives |
Strategic Partnership Projects [Formerly Known as Work for Others (Non-Department of Energy Funded Work)]
|
Strategic Partnership Projects is work performed for non-DOE entities by DOE/(NNSA personnel and/or their respective contractor personnel or the use of DOE/NNSA facilities for work that is not directly funded by DOE/NNSA appropriations. Cancels DOE O 481.1D and DOE M 481.1-1A Chg1 (PgChg). |
ageary |
Order |
MA - Office of Management
|
Dec 05, 2016
|
Archive |
|
directives |
New - DOE O 442.1B, Department of Energy Employee Concerns Program
|
The purpose of this Order is to establish the criteria and processes to maintain a consistent Employee Concerns Program (ECP) across the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). This Order provides direction to federal employees with respect to implementation of the ECP administered by federal ECP Managers (DOE ECP Managers) at DOE headquarters and at DOE/NNSA Field Offices (DOE ECP). Cancels/Supersedes DOE O 442.1A dated 6-6-01 and DOE G 442.1-1 dated 2-01-99. |
mudijo |
|
|
|
DOE O 483.1B Chg 1 (MinChg) |
directives |
DOE Cooperative Research and Development Agreements
|
The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Supersedes DOE O 483.1B |
BLally |
Order |
GC - Office of General Counsel
|
Dec 20, 2016
|
Archive |
006.08 |
directives |
Redelegation Order No. 00-006.08 to the Director, Office of Technology Transitions
|
|
mudijo |
Re-delegation |
|
Mar 19, 2019
|
Rescinded |
02.00C |
directives |
Designation Order No. 00-02.00C
|
|
mudijo |
Designation |
|
Mar 28, 2019
|
Rescinded |
22.00A |
directives |
Designation Order No. 00-22.00A to the Director, Office of Enterprise Assessments
|
|
mudijo |
Designation |
|
Mar 28, 2019
|
Rescinded |
DOE 5480.7 |
directives |
Fire Protection
|
To establish requirements for an "improved risk" level of fire protection sufficient to attain Department of Energy (DOE) objectives. A
higher standard of protection may be justified in certain instances for the purpose of national security, program continuity, or protection of the public. |
Directives Management Group |
Order |
EH - Office of Environment, Safety and Health
|
Dec 18, 1980
|
Archive |
|
directives |
Onsite
|
|
mudijo |
Definition |
|
|
|
|
directives |
Personnel Exposure
|
|
mudijo |
Definition |
|
|
|
|
directives |
Contractor Requirements Document (CRD)
|
|
mudijo |
Definition |
|
|
|
|
directives |
Financial Impact Analysis
|
|
mudijo |
Definition |
|
|
|
|
directives |
Working Day
|
|
mudijo |
Definition |
|
|
|
|
directives |
Child Support
|
|
mudijo |
Definition |
|
|
|
|
directives |
Designated Agent
|
|
mudijo |
Definition |
|
|
|
|
directives |
Performance Award
|
|
mudijo |
Definition |
|
|
|
|
directives |
Performance Standard
|
|
mudijo |
Definition |
|
|
|
|
directives |
New - DOE O 100.1E Chg 3 (MinChg), Secretarial Succession, Threat Level Notification, and Successor Tracking
|
To establish the Secretarial Order of Succession in the Department of Energy pursuant to section 202(a) of the Department of Energy Organization Act, 42 U.S.C. 7132(a) and establish a mechanism for tracking the locations of successors at various threat levels. Supersedes DOE O 100.1E Chg 2 (MinChg), dated 1-29-2019. |
mudijo |
|
|
|
008.21 |
directives |
Redelegation of Authority No. 00-008.21 to the Director of the Office of Financial Policy
|
|
mudijo |
Re-delegation |
|
Nov 09, 2006
|
Rescinded |
|
directives |
Delegations of Authority to the Office of the Associate Administrator for Management and Budget (NNSA)
|
The Secretarial Delegations of Authority Program has revised the Delegations and Designations numbering system. Contact the Directives Program for more information. |
mudijo |
|
|
|
DOE O 142.5 |
directives |
Committee on Foreign Investment in the United States
|
The order establishes the requirements and responsibilities for DOE in meeting its statutory obligations for the review of covered transactions filed with the Committee on Foreign Investment in the United States (CFIUS). Admin Chg 1, dated 4-21-14. |
ptelleen |
Order |
PI - Office of Policy and International Affairs
|
Oct 08, 2010
|
Archive |
|
directives |
Total Estimated Cost
|
|
mudijo |
Definition |
|
|
|
|
directives |
Warrant
|
|
mudijo |
Definition |
|
|
|
|
directives |
Atomic Energy Defense Activity
|
|
mudijo |
Definition |
|
|
|
|
directives |
Defense Nuclear Facility
|
|
mudijo |
Definition |
|
|
|
|
directives |
Nonreactor Nuclear Facility
|
|
mudijo |
Definition |
|
|
|
|
directives |
Production Facility
|
|
mudijo |
Definition |
|
|
|
|
directives |
Safety Class Structures, Systems, or Components (Safety-Class SSCs)
|
|
mudijo |
Definition |
|
|
|
|
directives |
Site Boundary
|
|
mudijo |
Definition |
|
|
|
|
directives |
Special Nuclear Material
|
|
mudijo |
Definition |
|
|
|
|
directives |
Utilization Facility
|
|
mudijo |
Definition |
|
|
|
|
directives |
Additional Protocol Declarations
|
|
mudijo |
Definition |
|
|
|