Other Project Costs
All other costs related to a project that are not included in the TEC. OPCs will include, but are not limited to: research and development; conceptual design and conceptual design report; startup and commissioning costs; NEPA documentation; PDS preparation; siting; and permitting requirements.
All other costs related to a project that are not included in the Total Estimated Costs, such as supporting research and development, pre-authorization costs prior to start of Title I design, plant support costs during construction, activation, and startup.