Acronyms
-
Acronyms on this page are found in the Attachments in current DOE Directives
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Acronym | Term |
---|---|
A |
|
1949 Act | Federal Property and Administrative Services Act of 1949 |
A/E | Architect/Engineer |
AA | Authorization/Approval Authority |
AACE | AACE International |
AADT | Annual Average Daily Traffic |
AADTT | Annual Average Daily Truck Traffic |
AAIM | Anticipated Asset Information Module |
AAR | After Action Report |
AAR | Association of American Railroads |
ABC | Activity Based Costing |
ABIH | American Board of Industrial Hygiene |
AC | Administrative Control |
AC | Actual Cost |
ACGIH | American Conference of Governmental Industrial Hygienists |
ACI | American Concrete Institute |
ACM | Asbestos Containing Material |
ACS | Access Control System |
ADCI | Association of Diving Contractors International |
ADP | Automatic Data Processing |
ADP | Academic Degree Program |
ADS | Activity Data Sheet |
AE | Acquisition Executive |
ADT | Average Daily Traffic |
ADTT | Average Daily Truck Traffic |
AEA | Atomic Energy Act of 1954 |
AEC | U.S. Atomic Energy Commission |
AED | Aerodynamic Equivalent Diameter |
AES | Automated Estimating System |
AFDCS | Active Facilities Data Collection System |
AGS | American Glovebox Society |
AHJ | Authority Having Jurisdiction |
AIHA | American Industrial Hygiene Association |
AISC | American Institute of Steel Construction |
ALARA | As Low as Reasonable Achievable |
ALD | Asset Level Data |
ALI | Annual Limit on Intake |
ALWCD | Activity Level Work Control Document |
ANS | American Nuclear Society |
ANSI | American National Standards Institute |
ANSI/EIA | American National Standards Institute/Electronic Industries Alliance |
ANST | American Society for Nondestructive Testing |
AO | Authorizing Official |
AoA | Analysis of Alternatives |
AOC | Alternate Operations Center |
AODR | Authorizing Official Designated Representative |
AOE | Accelerator Operations Envelope |
AOF | Alternate Operating Facility |
AP | Additional Protocol |
AP | Acquisition Plan |
API | American Petroleum Institute |
APLD | Acquisition Planning and Liaison Division |
APOC | Accountability Point-of-Contact |
AR | Asset Revitalization |
AREMA | American Railway Engineering and Maintenance-of-Way Association |
ARP | Alarm Response Procedures |
ARR | Accelerator Readiness Review |
AS | Acquisition Strategy |
ASE | Accelerator Safety Envelope |
ASHRAE | American Society of Heating, Refrigerating and Air-Conditioning Engineers |
ASL | Anticipated Service Life |
ASME | American Society of Mechanical Engineers |
ASO | Accelerator Safety Order |
ASQ | American Society for Quality |
ASQC | American Society for Quality Control |
ASTM | American Society of Testing and Materials |
ATL | Attractiveness Level |
AU | Office of Environment, Health, Safety and Security |
AUP | Agile Unified Process |
AUW | Authorized Unpriced Work |
AWE | Atomic Weapons Establishment |
AWWA | American Water Works Association |
Back to the Top | |
B |
|
B&R | Budget and Reporting |
BA | Budget Appropriation |
BAC | Budget at Completion |
BATFE | Bureau of Alcohols, Tobacco, Firearms and Explosives |
BBP | Best Business Practices |
BCP | Baseline Change Proposal |
BCPMSR | Business Center for Precious Metals Sales and Recovery |
BCR | Business Clearance Review |
BCWP | Budgeted Cost for Work Performed |
BCWR | Budgeted Cost for Work Remaining |
BCWS | Budgeted Cost for Work Scheduled |
BEIR | Biological Effects of Ionizing Radiations |
Be-LPT | Beryllium Lymphocyte Proliferation Test |
BEN | Beneficial |
BIA | Business Impact Analysis |
BM | Bill of Material |
BNA | Baseline Needs Assessment |
BO | Business Owner |
BO | Budgetary Outlay |
BOD | Beneficial Occupancy Date |
BOD | Basis of Design |
BOE | Basis of Estimate |
BOP | Business Operating Procedures |
BP | Best Practice |
BPA | Bonneville Power Administration |
BPA | Business Process Analysis |
BRH | Bureau of Radiological Health |
BSC | Balanced Scorecard |
BY | Budget Year |
BZ | Breathing Zone |
Back to the Top | |
C |
|
C | Confidential |
C&A | Certification and Accreditation |
C-FRD | Confidential-Formerly Restricted Data |
C-RD | Confidential-Restricted Data |
CA | Control Account |
CA | Controlled Access |
CACES | Corps of Engineers’ Computer-Aided Cost Engineering System |
CAD | Computer-Aided Drafting |
CAG | Continuity Advisory Group |
CAIRS | Computerized Accident/Incident Reporting System |
CAM | Control Account Manager |
CAM | Continuous Air Monitor |
CAP | Corrective Action Plan |
CAR | Corrective Action Request |
CARP | Climate Adaptation and Resilience Plan |
CAS | Contractor Assurance System |
CAT | Category |
CBB | Contract Budget Base |
CBD | Chronic Beryllium Disease |
CBDPP | Chronic Beryllium Disease Prevention Program |
CBFO | Carlsbad Field Office |
CBRNE | Chemical, Biological, Radiological, Nuclear, or Explosive |
CC | Change Control |
CC | Construction Contractors |
CCB | Change Control Board |
CCE | Continuing Core Expectation |
CCG | Continuity Coordination Group |
CCMD | Committee for Cost Methods Development |
CD | Critical Decision |
CD-0 | Critical Decision-0, Approve Mission Need |
CD-1 | Critical Decision-1, Approve Alternative Selection and Cost Range |
CD-2 | Critical Decision-2, Approve Performance Baseline CD-3 Critical Decision-3, Approve Start of Construction/Execution |
CD-3 | Critical Decision-3, Approve Start of Construction/Execution |
CD-4 | Critical Decision-4, Approve Start of Operations or Project Completion |
CDA | Critical Decision Approvers |
CDC | Centers for Disease Control and Prevention |
CDF | Cumulative Distribution Function |
CDL | Commercial Driver's License |
CDNS | Chief of Defense Nuclear Safety |
CDP | Concept Development Plan |
CDR | Conceptual Design Report |
CDR | Covenant Deferral Request |
CE | Chief Executive for Project Management |
CEC | Credited Engineered Control |
CED | Committed Effective Dose |
CEDE | Committed Effective Dose Equivalent |
CEMT | Continuity Emergency Management Team |
CEO | Chief Executive Officer |
CEOC | Consolidated Emergency Operations Center |
CERCLA | Comprehensive Environmental Response, Compensation, and Liability Act |
CEQ | Council on Environmental Quality |
CER | Cost Estimating Relationship |
CERCLA | Comprehensive Environmental Response Compensation and Liability Act |
CERG | Continuity Emergency Response Group |
CESER | Office of Cybersecurity, Energy Security, and Emergency Response |
CFE | Carbon Pollution-Free Electricity |
CFIUS | The Committee on Foreign Investment in the United States |
CFL | Computers for Learning |
CFO | Chief Financial Officer |
CFR | Code of Federal Regulations |
CFSR | Contract Funds Status Report |
CGD | Commercial Grade Dedication |
CHCO | Chief Human Capital Officer |
CHRIS | Corporate Human Resources Information System |
CI | Office of Congressional and Intergovernmental Affairs |
CICA | Competition in Contracting Act |
CIH | Certified Industrial Hygienist |
CII | Construction Industry Institute |
CIMC | Continuity Information Management Cell |
CIO | Chief Information Officer |
CIO | Continuous Improvement Opportunity |
CISO | Chief Information Security Officer |
CLT | Continuity Leadership Team |
CLO | Chief Learning Officer |
CM | Construction Management |
CM | Configuration Management |
CMAA | Crane Manufacturers Association of America |
CMD | Cost Methods Development |
CMI | Corrective Measures Implementation |
CMMI | Capability Maturity Model Integration |
CMMS | Computerized Maintenance Management System |
CMP | Contract Management Plan |
CMP | Configuration Management Plan |
CNWDI | Critical Nuclear Weapon Design Information |
CNS | Chief of Nuclear Security |
CNSS | Committee on National Security Systems |
CO | Contracting Officer |
COA | Code of Accounts |
CoC | Certificate of Compliance |
CoCA | Certificate of Competent Authority |
COG | Continuity of Government |
COGCON | Continuity of Government Condition |
COGCON | Continuity of Government Readiness Condition |
COOP | Continuity of Operations |
COR | Code of Record |
COR | Contracting Officer’s Representative |
COT | Continuity Operations Team |
COTS | Commercial-Off-the-Shelf |
CPARS | Contractor Performance Assessment Reporting System |
CPB | Contract Performance Baseline |
CPDS | Construction Project Data Sheet |
CPG | Capital Planning Guide (OMB A-11, Part 7) |
CPI | Cost Performance Index |
CPIC | Capital Planning and Investment Control |
CPM | Contractor Project Manager |
CPP | Contractor Project Performance |
CPR | Contract Performance Report |
CRAD | Criteria and Review Approach Document |
CRAR | Continuity Readiness Assurance Report |
CR | Change Request |
CRD | Contractor Requirements Document |
CRO | Community Reuse Organization |
CRS | Certified Realty Specialist |
CSA | Continued Service Agreement |
CSDR | Conceptual Safety Design Report |
CSE | Cognizant System Engineer |
CSF | Cybersecurity Framework |
CSI | Construction Specification Institute Code |
CSS | Construction Support Services (e.g., Title III) |
CSO | Cognizant Secretarial Officer |
CSO | Chief Sustainability Officer |
CSP | Criticality Safety Program |
CSPP | Cybersecurity Program Plan |
CSR | Continuity Status Reporting Form |
CST | Continuity Support Team |
CTA | Central Technical Authority |
CTE | Critical Technology Element |
CTED | Cumulative Total Effective Dose |
CUI | Controlled Unclassified Information |
cum | Cumulative |
CV | Cost Variance |
CVFR | Current Value of Funds Rate |
CVS | Confinement Ventilation System |
CVSA | Commercial Vehicle Safety Alliance |
CWBS | Contract Work Breakdown Structure |
CWIP | Construction Work in Progress |
CX | Categorical Exclusion |
Cx | Commissioning |
CY | Calendar Year |
Back to the Top | |
D |
|
D | Directive |
D/A | Departments and Agencies |
D&D | Decontamination and Decommissioning |
DAC | Derived Air Concentration |
DAC | Daily Administrative Checks |
DBA | Design Basis Accident |
DBT | Design Basis Threat |
DCAA | Defense Contract Audit Agency |
DCIA | Debt Collection Improvement Act |
DCMA | Defense Contract Management Agency |
DCOI | Data Center Optimization Initiative |
DCS | Data Collection Sheet |
DCS | Distributed Control System |
DDA | Declaration Decision Assistant |
DDR | Detailed Design Review |
DE | Departmental Element |
DE-CSPP | Departmental Element Cybersecurity Program Plan |
DEAR | Department of Energy Acquisition Regulation |
DED | Data Element Dictionary |
DERG | Devolution Emergency Response Group |
DESC | Defense Energy Support Center |
DHS | U.S. Department of Homeland Security |
DI | Defective Items |
DID | Data Item Description |
DIL | Derived Investigation Level |
DL | Decision Level |
DM | Deferred Maintenance and Repair |
DME | Development, Modernization and Enhancement |
DNFSB | Defense Nuclear Facilities Safety Board |
DO | Delegating Official |
DOC | Document |
DoD | U.S. Department of Defense |
DOE | U.S. Department of Energy |
DOE AWARe | Department of Energy Alert, Warning, Accountability, and Response |
DOE CO | Department of Energy Certifying Official |
DOE BTM | Department of Energy Bridge and Tunnel Manager |
DOE-HDBK | Department of Energy Handbook |
DOELAP | Department of Energy Laboratory Accreditation Program |
DOJ | Department of Justice |
DOS | Disk Operating System |
DOS | Department of State |
DOT | Department of Transportation |
DP | Office of Defense Programs |
DPM | Disintegrations per Minute |
DPT | Design Planning Tabulation |
DR | Discrepancy Report |
DRA | Declaration Review Assistant |
DRB | Directives Review Board |
DRP | Disaster Recovery Plan |
DSA | Documented Safety Analysis |
DTIC | Defense Technical Information Center |
DU | Depleted Uranium |
DUA | Deliberate Unauthorized Act |
DUU | Deliberate Unauthorized Use |
DWA | Declaration Writing Assistant |
Back to the Top | |
E |
|
EA | Enterprise Architecture |
EA | Environmental Assessment |
EAC | Estimate at Completion |
EAC | Energy Attribute Certificate |
EADS | Energy Asset Disposal System |
EAR | Export Administration Regulations |
EBS | Environmental Baseline Survey |
ECCN | Export Control Classification Number |
ECER | Enhanced Cost Estimating Relationship |
ECG | Enduring Constitutional Government |
ECI | Export Controlled Information |
E-CSPP | Enterprise Cybersecurity Program Plan |
ECWFG | Excess Contaminated Facilities Working Group |
EDP | Executive Development Plan |
ED&I | Engineering, Design, and Inspection |
EEO | Equal Employment Opportunity |
EFCOG | Energy Facility Contractors Group |
EHFFP | Equipment Held for Future Projects |
EHRI | Enterprise Human Resources Integration |
EHSS | Environment, Health, Safety and Security |
EIA | Electronic Institute of America |
EIA | Electronic Industries Alliance |
EIR | External Independent Review |
EIS | Environmental Impact Statement |
EISA | Energy Independence and Security Act |
EITS | Equipment Important to Safety |
EM | Environmental Management |
EMP | Emergency Management Plan |
EMS | Environmental Management System |
EnMS | Energy Management System |
EO | Executive Order |
EOC | Emergency Operations Center |
EOC | Element of Cost |
EOP | Executive Office of the President |
EPA | Environmental Protection Agency |
EPAct | Energy Policy Act of 1992 or 2005 |
EPRI | Electric Power Research Institute |
EQ | Environmental Qualification |
ERAP | Emergency Readiness Assurance Plan |
ERDA | Energy Research and Development Administration |
ERE | Equipment Readiness Evaluations |
ERG | Emergency Relocation Group |
ERG-LT | ERG Leadership Team |
ERG-ST | ERG Support Team |
ERMC | Environmental Restoration Management Contractor |
ERPG | Emergency Response Planning Guide |
ES&H | Environment, Safety and Health |
ESA | Essential Supporting Activities |
ESAAB | Energy System Acquisition Advisory Board |
ESAARs | Energy System Acquisition Advisory Reviews |
ESH | Environment, Safety, and Health |
ESN | Enterprise Secure Network |
ESPC | Energy Savings Performance Contract |
ESS | Essential |
ESS | Evaluation of the Safety of the Situation |
ETC | Estimate to Complete |
ETTP | East Tennessee Technology Park |
EU | Enriched Uranium |
EV | Earned Value |
EV | Emergency Vehicle |
EVM | Earned Value Management |
EVMS | Earned Value Management System |
EVT | Earned Value Technique |
Back to the Top | |
F |
|
F&ORs | Functional and Operations Requirements |
FI/CMS | Facilities Investigation/Corrective Measures Study |
F/O | Functional/Operational |
FA | Facility Assessment |
FAA | Financial Assistance Awards |
FAQ | Frequently Asked Questions |
FAR | Federal Acquisition Regulation |
FASA | Federal Acquisition Streamlining Act |
FAST | Federal Automotive Statistical Tool |
FAT | Factory acceptance testing |
FCAT | Federal Continuity Assessment Tool |
FCC | Federal Communications Commission |
FCD | Federal Continuity Directive |
FCD-1 | Federal Continuity Directive 1 |
FCD-2 | Federal Continuity Directive 2 |
FCM | Fracture Critical Member |
FDCCI | Federal Data Center Consolidation Initiative |
FDO | Fee Determining Official |
FedRamp | Federal Risk and Authorization Management Plan |
FECA | Federal Employees’ Compensation Act |
FEMA | Federal Emergency Management Agency |
FEMP | Federal Energy Management Program |
FEV | Forced Expiratory Volume |
FF | Finish to Finish |
FHA | Fire Hazards Analysis |
FHWA | Federal Highway Administration |
FI | Facility Investigation |
FIMS | Facility Information Management System |
FIMS | Facilities Information Management System |
FINSA | The Foreign Investment and National Security Act of 2007 |
FIPS | Federal Information Processing Standards |
FISC | Facilities and Infrastructure Steering Committee |
FISMA | Federal Information Security Modernization Act |
FISMA | Federal Information Security Management Act |
FITARA | Federal Information Technology Acquisition Reform Act |
FM | Field Management |
FM-50 | Office of Infrastructure Acquisition, Office of the Associate Deputy Secretary for Field Management |
FMEA | Failure Mode and Effects Analysis |
FMIS | Fleet Management Information System |
FMR | Federal Management Regulation |
FMRS | Federal Mission Resilience Strategy |
FMS | Financial Management Service |
FO | Financial Officer |
FOC | FEMA Operations Center |
FOIA | Freedom of Information Act |
FONSI | Finding of No Significant Impact |
FP | Fixed Price |
FPCM | Federal Project Controls Manager |
FPD | Federal Project Director |
FPE | Fire Protection Engineer |
FPM | Federal Project Manager |
FPMR | Federal Property Management Regulations |
FPRA | Forward Pricing Rate Agreement |
FQA | Fastener Quality Act |
FR | Federal Register |
FRA | Federal Railroad Administration |
FRA | Federal Railway Administration |
FRA | Functions, Responsibilities, and Authorities |
FRAM | Functions, Responsibilities, Authorities Manual |
FRD | Formerly Restricted Data |
FRPP | Federal Real Property Profile |
FS | Feasibility Study |
FS | Finish to Start |
FSC | Federal Supply Classification |
FSCG | Federal Supply Classification Group |
FSR | Feasibility Study Report |
FSRIA | Farm Security and Rural Investment Act |
FTE | Full Time Employee |
FTE | Full-Time Equivalents |
FVC | Forced Vital Capacity |
FY | Fiscal Year |
FYRT | Five-Year Rolling Timeline |
Back to the Top | |
G |
|
G | Guide |
GAO | U.S. Government Accountability Office |
GC | Office of General Counsel |
GERT | General Employee Radiological Training |
GETS | Government Emergency Telecommunications Service |
GFE | Government Furnished Equipment |
GHG | Greenhouse Gas |
GIDEP | Government-Industry Data Exchange Program |
GOGO | Government-Owned Government-Operated |
GPA | Grade Point Average |
GPP | General Plant Project |
GPRA | Government Performance and Results Act |
GSA | General Services Administration |
GWIDS | Government Emergency Telecommunications Service/Wireless Priority Service Information Distribution System |
GWP | Global Warming Potential |
Back to the Top | |
H |
|
H&N | Holmes & Narver (H&N) |
HA | Hazard Assessment |
HA | Hazard Analysis |
HAXOPS | Hazards of Operations |
HAZWOPER | Hazardous Waste Operations and Emergency Response |
HDBK | Handbook |
HC | Office of the Chief Human Capital Officer |
HCA | Head of Contracting Activity |
HDE | Heads of Departmental Element |
HDV | High Dollar Value |
HEC | Hydraulic Engineering Circular |
HEPA | High Efficiency Particulate Air (Filter) |
HFE | Heads of Field Elements |
HHS | Health and Human Services |
HLW | High-Level Waste |
HMI | Human Machine Interface |
HMR | Hazardous Materials Regulations |
HPC | High Performance Computing |
HPI | Human Performance Improvement |
HPS | Health Physics Society |
HPSB | High Performance and Sustainable Building |
HQ | Headquarters |
HRPP | High Risk Personal Property |
HRS | Hazard Ranking System |
HSPD | Homeland Security Presidential Directive |
HSS | Office of Health, Safety and Security |
HEU | Highly Enriched Uranium |
HVA | High Value Asset |
HVAC | Heating, Ventilation and Air Conditioning |
HVAC | Heating, Ventilating, and Air-Conditioning |
Back to the Top | |
I |
|
I&C | Instrumentation and Control |
iJC3 | Integrated Joint Cybersecurity Coordination Center |
IAEA | International Atomic Energy Agency |
IAT | Intake Assessment Team |
IBC | International Building Code |
ICAO | International Civil Aviation Organization |
ICE | Independent Cost Estimate |
ICECAN | Independent Cost Estimating Contingency Analyzer |
ICPT | Integrated Contractor Purchasing Team |
ICR | Independent Cost Review |
ICRP | International Commission on Radiological Protection |
ICRU | International Commission on Radiation Units and Measurements |
ID | Identification |
ID | Inventory Difference |
IDLH | Immediately Dangerous to Life and Health |
IDP | Individual Development Plan |
IEC | Infrastructure Executive Committee |
IEC | International Electrotechnical Commission |
IEEE | Institute of Electrical and Electronics Engineers |
IES | Illuminating Engineering Society |
IESNA | Illuminating Engineering Society of North America |
IFI | Integrated Facilities and Infrastructure Budget Crosscut |
IG | Inspector General |
IGCE | Independent Government Cost Estimate |
IL | Investigation Level |
ILP | Industry Leading Practices |
IM | Office of the Chief Information Officer |
IMDG | International Maritime Dangerous Goods |
IMGB | Information Management Governance Board |
IMO | International Maritime Organization |
IMP | Integrated Master Plan |
IMPD | Integrated Program Management Division |
IMPR | Integrated Program Management Report |
IMS | Integrated Master Schedule |
IN | Office of Intelligence and Counterintelligence |
IND | Improvised Nuclear Device |
INPO | Institute of Nuclear Power Operations |
IOC | Initial Operating Capability |
IOP | Integrated Oversight Plan |
IP | Improvement Plan |
IP | Intellectual Property |
IPA | Intergovernmental Personnel Act |
IPMR | Integrated Program Management Report |
IPR | Independent Project Review |
IPS | Integrated Project Schedule |
IPT | Integrated Project Team |
IPT | Integrated Project/Program Team |
IR | Independent Review |
IRB | Internal Review Board |
IRS | Internal Review and Assessment |
IRS | Internal Revenue Service |
ISA | International Society of Automation |
ISC | IAEA Steering Committee |
ISCP | Information System Contingency Plan |
ISM | Integrated Safety Management |
ISMS | Integrated Safety Management System |
ISO | International Organization for Standardization |
ISO | International Standards Organization |
IT | Information Technology |
ITAR | International Traffic in Arms Regulations |
IT PM | IT Project Manager |
IT PMO | IT Project Manager Office |
IV | Independent Verification |
IVR | Implementation Verification Review |
Back to the Top | |
J |
|
JCL | Joint Cost and Schedule Confidence Level |
JCO | Justification for Continued Operations |
JIC | Joint Information Command |
JMN | Justification of Mission Need |
JTG | Joint test group |
K |
|
KD | Key Decision |
KPP | Key Performance Parameter |
L |
|
LA | Limited Area |
LANL | Los Alamos National Laboratory |
LCC | Life Cycle Cost |
LCCE | Life-Cycle Cost Estimate |
LCO | Limiting Condition for Operation |
LDD | Loss, Damaged, and Destruction |
LEDP | Laboratory Equipment Donation Program |
LEED | Leadership in Energy and Environmental Design |
LEU | Low Enriched Uranium |
LL | Lower Level |
LLNL | Lawrence Livermore National Laboratory |
LLW | Low-Level Waste |
LMC | Life Cycle Management |
LMMO | Leads Material Management Organization |
LMS | Learning Management System |
LN | Liquid Nitrogen |
LOE | Level of Effort |
LOI | Line of Inquiry |
LOTO | Lock Out/Tag Out |
LRE | Latest Revised Estimate |
LRFD | Load and Resistance Factor Design |
LTS | Long-Term Stewardship |
Back to the Top | |
M |
|
M | Manual |
M | Million ($) |
M | Milestone |
MA | Office of Management |
MAA | Material Access Area |
MA-50 | Office of Sustainability and Asset Management |
MBA | Material Balance Area |
MBE | AASHTO Manual for Bridge Evaluation |
MC&A | Nuclear Material Control and Accountability |
MCEER | Multidisciplinary Center for Earthquake Engineering Research |
M&O | Management and Operations |
M&O | Management and Operating |
M&S | Modeling and Simulation |
M&TE | Measuring and Test Equipment |
MAPEP | Mixed Analyte Performance Evaluation Program |
MDA | Minimum Detectable Amount/Activity |
MEF | Mission Essential Functions |
MEL | Master Equipment List |
MERRTT | Modular Emergency Response Radiological Transportation Training |
MIE | Major Items of Equipment |
MLLW | Mixed Low-Level Waste |
MMP | Materials Management Plan |
MNS | Mission Need Statement |
MOA | Memorandum of Agreement |
MOE | Measure of Effectiveness |
MOP | Measure of Performance |
MOU | Memorandum of Understanding |
MPFL | Maximum Possible Fire Loss |
MR | Management Reserve |
MRP | Medical Removal Protection |
MS | Major System Project |
MSDS | Material Safety Data Sheet |
MSP | Major System Project |
MT | Mission Tasks |
MTBF | Mean Time Between Failures |
MVIR | Mission Validation Independent Review |
MYSPMP | Multi-Year Strategy and Program Management Plan |
Back to the Top | |
N |
|
N/A | Not Applicable |
NA-GC | NNSA Office of General Counsel |
NA-IM | NNSA Office of Information Management and Chief Information Officer |
NA-MB | NNSA Management and Budget Office |
NAP | NNSA Policy Letter |
NARA | National Archives and Records Administration |
NASA | National Aeronautics and Space Administration |
NBI | National Bridge Inventory |
NBIS | National Bridge Inspection Standards |
NCC | National Continuity Coordinator |
NCO | NEPA Compliance Officer |
NCP | FEMA National Continuity Programs |
NCR | Non-Conformance Report |
NCR | National Capital Region |
NCRP | National Council on Radiation Protection |
NCRP | National Council on Radiation Protection and Measurements |
NCSD | National Communications System Directive |
NCSL | National Conference of Standards Laboratories |
NDE | Non-Destructive Examination |
NDIA | National Defense Industrial Association |
NDT | Non-Destructive Testing |
NE | Office of Nuclear Energy |
NEC | National Electric Code |
NECPA | National Energy Conservation Policy Act |
NEF | National Essential Functions |
NEPA | National Environmental Policy Act |
NERC | North American Electric Reliability Corporation |
NFPA | National Fire Protection Association |
NHI | National Highway Institute |
NHS | National Highway System |
NIOSH | National Institute for Occupational Safety and Health |
NISP | National Industrial Security Program |
NIST | National Institute of Standards and Technology |
NMIA | Nuclear Materials Inventory Assessment |
NMID | Nuclear Materials Integration Division |
NMMP | Nuclear Materials Management Plan |
NMMSS | Nuclear Material Management and Safeguards System |
NN | Office of Nuclear Nonproliferation |
NNPP | Naval Nuclear Propulsion Program |
NNSA | National Nuclear Security Administration |
NNSA CO | National Nuclear Security Administration Certifying Official |
NPE | Negative-Pressure Enclosure |
NPH | Natural Phenomena Hazards |
NPH | Natural Phenomena Standard |
NPL | National Priorities List |
NPV | Net Present Value |
NQA | Nuclear Quality Assurance |
NQA-1 | Nuclear Quality Assurance Standard – 1 (ANSI/ASME standard) |
NR | Office of Naval Reactors |
NRC | Nuclear Regulatory Commission |
NRC | National Research Council |
NSC | National Security Council |
NSE | Nuclear Security Enterprise |
NSG | Nuclear Suppliers Group |
NSI | National Security Information |
NSPD | National Security Presidential Directive |
NSS | National Security Systems |
NTC | National Training Center |
NTI | National Tunnel Inventory |
NU | Natural Uranium |
NUREG | Nuclear Regulatory Guide |
NWD | Nuclear Weapon Data |
NWPA | Nuclear Waste Policy Act of 1982, as amended |
Back to the Top | |
O |
|
O | Order |
OANM | Other Accountable Nuclear Material |
O&M | Operation and Maintenance |
OBS | Organization Breakdown Structure |
OCFO | Office of the Chief Financial Officer |
OCIO | Office of the Chief Information Officer |
OCRWM | Office of Civilian Radioactive Waste Management |
ODC | Other (Government) Direct Cost |
ODFSA | Officially Designated Federal Security Authority |
ODH | Oxygen Deficiency Hazard |
ODM | Oxygen Deficiency Monitor |
ODS | Ozone-Depleting Substances |
OE | Operating Expense |
OE | Operating Experience |
OECM | Office of Engineering and Construction Management |
OEP | Occupant Emergency Plan |
OGA | Other Government Agency |
OGC | Office of General Counsel |
OHA | Office of Hearings and Appeals |
OHSAS | Occupational Health and Safety Assessment Series |
OIG | Office of Inspector General |
OJT | On-The-Job Training |
OMB | Office of Management and Budget |
ONMI | Office of Nuclear Materials Integration |
OPAM | Office of Procurement and Assistance Management |
OPC | Other Project Costs |
OPI | Office of Primary Interest |
OPM | Office of Personnel Management |
OPMO | Organizational Property Management Officer |
OPSEC | Operations Security |
ORNL | Oak Ridge National Laboratory |
ORPS | Occurrence Reporting and Processing System |
ORR | Operational Readiness Review |
OSF | Other Structures and Facilities |
OSHA | Occupational Safety and Health Administration |
OST | Office of Secure Transportation |
OSTI | Office of Scientific and Technical Information |
OSTP/OMB | Office of Science and Technology Policy/Office of Management and Budget |
OTB | Over Target Baseline |
OTS | Over Target Schedule |
OUO | Official Use Only |
OWCP | Office of Workers’ Compensation Programs |
Back to the Top | |
P |
|
P | Policy |
P&IDs | Piping and Instrumentation Diagrams |
PA/SI | Preliminary Assessment/Site Inspection |
PA | Property Administrator |
PA | Office of Public Affairs |
PA | Protected Area |
PACE | Plant and Capital Equipment |
PARS | Project Assessment and Reporting System |
PARS II | Project Assessment and Reporting System II |
PASEG | Planning and Scheduling Excellence Guide |
PB | Performance Baseline |
PBC | Performance Based Contract |
PBS | Performance Baseline Summary |
PC | Performance Category |
PCA | Plan of Corrective Action |
PCC | Project Completion Criteria |
PCL | Project Complexity Level |
PD&E | Planning Design and Engineering |
PDAS | Principal Deputy Assistant Secretary for International Affairs |
Probability Distribution Function | |
PDRI | Project Definition Rating Index |
PDS | Project Data Sheet |
PDSA | Preliminary Documented Safety Analysis |
PE | Property Executive |
PED | Project Engineering and Design |
PEL | Personal Exposure Limit |
PEL | Permissible Exposure Limit |
PEM | Project Execution Model |
PEP | Project Execution Plan |
PERT | Programmed Evaluation and Review Technique |
PFAS | Perfluoroalkyl and Polyfluoroalkyl Substances |
PFDs | Process Flow Diagrams |
PHA | Preliminary Hazard Analysis |
PHAR | Preliminary Hazard Analysis Report |
PIDS | Property Information Database System |
PII | Personally Identifiable Information |
PILT | Payments in Lieu of Taxes |
PIO | Public Information Officer |
PIR | Policy Information Resource |
PISA | Potential Inadequacy of the (Documented) Safety Analysis |
P.L. | Public Law |
PL | Performance Level |
PLC | Programmable Logic Controller |
PM | Office of Project Management Oversight and Assessments |
PM | Project Manager |
PM | Program Manager |
PM | Office of Project Management |
PM | Preventive Maintenance |
PMA | Power Marketing Administration |
PMB | Performance Measurement Baseline |
PMBOK | Project Management Body of Knowledge |
PMCDP | Project Management Career Development Program |
PMCO | Precious Metals Control Officer |
PME | Project Management Executive |
PMEF | Primary Mission Essential Functions |
PMI | Project Management Institute |
PMO | Project Management Office |
PMP | Project Management Plan |
PMRC | Project Management Risk Committee |
PMSC | Program Management Systems Committee |
PMSO | Project Management Support Office |
PMT | Post Maintenance Testing |
PMT | Post Maintenance Test |
PNL | Pacific Northwest Laboratory |
PO | Project Owner |
POA | Plan of Action |
POA&M | Plan of Action and Milestones |
POC | Point of Contact |
POPR | Potential for an Occurring or Past Release |
PP | Planning Package |
PPBES | Planning, Programming, Budgeting and Execution System |
PPD | Presidential Policy Directive |
PPE | Personal Protective Equipment |
PPR | Project Peer Review |
PRD | Program Requirements Document |
PSAR | Preliminary Safety Analysis Report |
PSD | Prevention of Significant Deterioration |
PSDR | Preliminary Safety Design Report |
PSE | Planned Special Exposure |
PSO | Program Secretarial Officer |
PSO | Project Support Officer |
PSO | Project Secretarial Officer |
PSWBS | Project Summary Work Breakdown Structure |
PT | Project Team |
PV | Planned Value |
PVD | Programmatic Value Determination |
Back to the Top | |
Q |
|
QA | Quality Assurance |
QAP | Quality Assurance Program |
QAPP | Quality Assurance Program Plan |
QARD | Quality Assurance Requirements Document |
QBD | Quantifiable Backup Data |
QC | Quality Control |
QIP | Quality Assurance Implementation Plan |
QL/CSR | Quick Look and Continuity Status Reporting Form |
QPR | Quarterly Project Review |
Back to the Top | |
R |
|
R&D | Research and Development |
RA | Readiness Assessment |
RA | Risk Assessment |
RAM | Responsibility Assignment Matrix |
RAMI | Reliability, Accessibility, Maintainability, Inspectability |
RAP | Radiological Assistance Program |
RAP | Remedial Action Plan |
RCAPTS | Readiness Certification Assurance Process Tracking System |
RCO | Radiological Control Organization |
RCRA | Resource Conservation and Recovery Act |
RCT | Radiological Control Technician |
RD | Restricted Data |
RD | Requirements Document |
REA | Request for Equitable Adjustment |
REC | Renewable Energy Certificate |
RECO | Real Estate Contracting Officer |
REQ | Required |
RF | Radio Frequency |
RFA | RCRA Facility Assessment |
RFC | Review for Cause |
RFI | Request for Information |
RFO | Reduced-Flow Orifice |
RFP | Request for Proposal |
RGD | Radiation-Generating Device |
RI | Remedial Investigation |
RI/FS | Remedial Investigation/Feasibility Study |
RIDS | Records Inventory and Disposal Schedule |
RIS | Reporting Identification Symbol |
RLS | Resource Loaded Schedule |
RM | Records Management |
RMA | Risk Management Approach |
RMA | Radioactive Material Area |
RMP | Risk Management Plan |
RN | Repair Needs |
ROD | Record of Decision |
ROI | Region of Influence |
ROM | Rough Order of Magnitude |
RPP | Radiation Protection Program |
RPV | Replacement Plant Value |
RR | Readiness Review |
RRC | Regional Response Coordinator |
RSICC | Radiation Safety Information Computational Center |
RTM | Requirements Traceability Matrix |
RWP | Radiation Work Permit |
RWT | Radiological Worker Training |
Back to the Top | |
S |
|
S | Secret |
S-1 | The Secretary of Energy |
S-2 | The Deputy Secretary of Energy |
S-3 | The Under Secretary |
S4 | The Under Secretary for Science |
S-5/NA-1 | The Under Security for Nuclear Security and Administrator, National Nuclear Security Administration |
S&S | Safeguards and Security |
SAT | Systematic Approach to Training |
SAA | Startup Authorization Authority |
SAC | Specific Administrative Controls |
SAD | Safety Assessment Document |
SAE | Secretarial Acquisition Executive |
SAE | Society of Automotive Engineers |
SAISO | Senior Agency Information Security Officer |
SAOP | Senior Agency Official for Privacy |
SAR | Safety Analysis Report |
SARA | Superfund Amendments and Reauthorization Act of 1986 |
SARP | Safety Analysis Report for Packaging |
SBAA | Safety Basis Approval Authority |
SC | Office of Science |
SC | Safety Class |
SCADA | Supervisory Control and Data Acquisition |
S/CIs | Suspect/Counterfeit Items |
SCM | Software Configuration Management |
SCRM | Supply Chain Risk Management |
SCRS | Sustainable Climate-Ready Sites |
SCWE | Safety Conscious Work Environment |
SD | Supplemental Directive |
SDD | System Design Description |
SDD | Software Design Description |
SDLC | System Development Lifecycle |
SDP | Software Development Plan |
SDS | Safety Design Strategy |
SE | Systems Engineering |
SE&I | Systems Engineering and Integration |
SEI | Software Engineering Institute |
SECON | Security Condition |
SEG | Similarly Exposed Group |
SEM | Systems Engineering Methodology |
SER | Safety Evaluation Report |
SF | Standard Form |
SF | Start to Finish |
SFMB | Surplus Fissile Materials Baseline |
S-FRD | Secret-Formerly Restricted Data |
SG | Safety Guide |
SHL | Seismic Hazard Level |
SHV | Specialized Hauling Vehicles |
SI | Site Inspection |
SI&A | Structure Inventory and Appraisal |
SIPRNET | Secret Internet Protocol Router Network |
SISM | Subcommittee on International Safeguards and Monitoring |
SLA | Service Level Agreement |
SLTT | State, local, territorial, and tribal |
SNM | Special Nuclear Material |
SOP | Standard Operating Procedure |
SP | Sustainability Plan |
SRA | Security Risk Assessment |
S-RD | Secret-Restricted Data |
S/RID | Standards/Requirements Identification Document |
SISUS | Subgroup on IAEA Safeguards in the United States |
SLAC | Stanford Linear Accelerator Center |
SLPP | Summary Level Planning Package |
SM | Schedule Margin |
SME | Subject Matter Expert |
SMP | Safety Management Program |
SMP | Small and Medium Projects |
SMS | Safety Management System |
SNBIBE | Specification for the National Bridge Inventory Bridge Elements |
SNF | Spent Nuclear Fuel |
SNM | Special Nuclear Materials |
SOM | Shift Operations Manager |
SOMD | Site Occupational Medical Director |
SOP | Standard Operating Procedure |
SOW | Statement of Work |
SPI | Schedule Performance Index |
SPE | Senior Procurement Executive |
SPMP | Software Project Management Plan |
SPO | Sustainability Performance Office |
SQA | Software Quality Assurance |
SQAP | Software Quality Assurance Plan |
SR | Surveillance Requirement |
SRA | Schedule Risk Analysis |
SRC | Seismic Hazard Level |
SRPO | Senior Real Property Officer |
SRS | Software Requirement Specification |
SS | Steady State |
SS | Safety Significant |
SS | Start to Start |
SSA | Statement of Security Assurance |
SSC | Specific Administrative Controls |
SSC | Sustainability Steering Committee |
SSCs | Structures, Systems, and Components |
SSCC | Senior Sustainability Steering Committee |
SSE | Structures, Systems, and Equipment |
SSIMS | Safeguards and Security Information Management System |
SSO | Senior Sustainability Officer |
SSP | Site Sustainability Plan |
SSP | Safeguards and Security Program |
SSPP | Strategic Sustainability Performance Plan |
STMS | Senior Technical Safety Manager |
STD | Standard |
Sub MBA | Subsidiary Material Balance Area |
SV | Schedule Variance |
SVT | Schedule Visibility Task |
SVAR | Security Vulnerability Assessment Report |
SW-CMM | Software Capability Maturity Model |
SWG | Sustainability Working Group |
SWMU | Solid Waste Management Unit |
Back to the Top | |
T |
|
TAB | Total Allocated Budget |
TEC | Total Estimated Cost |
TECC | Transportation Emergency Control Center |
TEC/WG | Transportation External Coordination Working Group |
TECC | Transportation Emergency Communications Center |
TED | Total Effective Dose |
TEDE | Total Effective Dose Equivalent |
TEPP | Transportation Emergency Preparedness Program |
TCO | Total Cost of Ownership |
TCPI | To Complete Performance Index |
TFM | Treasury Financial Manual |
TFNI | Trans-classified Foreign Nuclear Information |
THIRA | Threat and Hazard Identification and Risk Assessment |
TID | Tamper-Indicating Device |
TIPR | Technical Independent Project Review |
TL | Truckload |
TL | Technical Lead |
TLD | Thermo Luminescent Dosimeter |
TLV | Threshold Limit Value |
TMP | Technology Maturation Plan |
TNA | Training Needs Assessment |
TOMIE | Tunnel Operations, Maintenance, Inspection, and Evaluation |
TOP | Transition to Operations Plan |
TPC | Total Project Cost |
TR | Technical Report |
TRA | Technology Readiness Assessment |
TRADE | Training Resources and Data Exchange |
TRAGIS | Transportation Routing Analysis Geographic Information System |
TRANSCOM | Transportation Tracking and Communications System |
TRL | Technology Readiness Level |
TRU | Transuranic |
TS | Top Secret |
TS | Technical Sponsor |
TS/SCI | Top Secret/Sensitive Compartmented Information |
TS-FRD | Top Secret-Formerly Restricted Data |
TS-RD | Top Secret-Restricted Data |
TSD | Transportation Safety Document |
TSP | Telecommunications Service Priority |
TSR | Technical Safety Requirement |
TT&E | Testing, Training and Exercises |
TWA | Time-Weighted Average |
TWD | Technical Work Document |
Back to the Top | |
U |
|
UAT | User Acceptance Test |
UB | Undistributed Budget |
UC | Use Control |
UCNI | Unclassified Controlled Nuclear Information |
UCR | Uniform Capital Recovery |
UCTI | Unclassified Controlled Technical Information |
UESC | Utility Energy Service Contract |
UFGS | Unified Facilities Guide Specification |
UFP-QS |
Uniform Federal Policy for Implementing Environmental Quality Systems |
UL |
Upper Level |
UMTRA |
Uranium Mill Tailings Remedial Action |
UMTRAP | Uranium Mill Tailing Remedial Action Project |
UMTRCA | Uranium Mill Tailings Radiation Control Act of 1978 |
UNSCEAR | United Nations Scientific Committee on the Effects of Atomic Radiation |
US | Under Secretary of Energy |
U.S | United States |
U.S.C. | United States Code |
US-CERT | United States Computer Emergency Readiness Team |
USI | Unreviewed Safety Issue |
USLW | United States Law Week |
USPS | United States Postal Service |
USQ | Unreviewed Safety Question |
USQD | Unreviewed Safety Question Determination |
UV | Ultraviolet |
V |
|
V&V | Verification and Validation |
VV&A | Verification, Validation, and Accreditation |
VA | Vulnerability Assessment |
VAC | Variance at Completion |
VARP | Vulnerability Assessment and Resilience Plan |
VCS | Voluntary Consensus Standards |
VDP | Vulnerability Disclosure Program |
VE | Value Engineering |
VHEU | Very Highly Enriched Uranium |
VM | Value Management |
VOA | Voluntary Offer Agreement |
VPP | Voluntary Protection Program |
W |
|
WA | Work Authorization |
WBDG | Whole Building Design Guide |
WBS | Work Breakdown Structure |
WDA | Weapon Display Area |
WDACS | Weapons Data Access Control System |
WFO | Work for Others |
WIPP | Waste Isolation Pilot Plant |
WIPP | Waste Isolation Pilot Project |
WMD | Weapon of Mass Destruction |
WP | Work Package |
WP&C | Work Planning and Control |
WPS | Wireless Priority Service |
WR/WO | Work Request/Work Order |
X |
|
XP | Extreme Programming |
Back to the Top | |
Y |
|
YSO | Y-12 Site Office |
Back to the Top | |
Z |
|
ZBA | Zero Budget Activity |
ZEV | Zero Emission Vehicle |
Back to the Top |
Document Actions