Routine Operation


Of an accelerator commences at that point where DOE authorization has been granted either (1) because the commissioning effort is sufficiently complete to provide confidence that the risks are both understood and acceptable and the operation has appropriate safety bounds, or (2) to permit the re-introduction of a particle beam after the facility has been directed to cease operation by DOE because of an environment, safety, and health concern.